Index of /data/DecDocs/130120
Name Size
Consent Order.HW.130120.2007-02-22.index_A2-0552-0606.pdf 3.9M
Consent Order.NationalGrid Keyspan MGP.2023-06-16.Consent Order_K _Fulton Works.pdf 2.9M
Easement.HW.130120.2017-06-19.Environmental Easement - June 19, 2017.pdf 3.7M
Easement.HW.130120.2017-06-19.Fully Executed EE Pkg. with Tax Form 6-26-17.pdf 4.0M
Easement.NationalGrid Keyspan MGP.2022-11-16.Recorded Environmental Easement - K Patchogue.pdf 2.1M
Permit.NationalGrid Keyspan MGP.2024-06-17.SWPH Tidal Wetlands Permit .pdf 1.0M
Report.HW.130120.2007-05-01.HistoricGasOperations_rev4.pdf 3.9M
Report.HW.130120.2008-07-08.IRMCompletionReport.pdf 10M
Report.HW.130120.2011-12-14.SC_Report_Final.pdf 27M
Report.HW.130120.2014-09-26.2014 Annual GW Report.pdf 1.1M
Report.HW.130120.2015-04-29.Test Trench Soil Sampling Report.pdf 3.3M
Report.HW.130120.2015-05-04.Utility Trench Soil Screening Report.pdf 1.6M
Report.HW.130120.2015-07-06.2015 Annual GW Report.pdf 1.3M
Report.HW.130120.2015-10-06.Conduit Trench Soil Samples.pdf 209K
Report.HW.130120.2016-08-15.2016 Annual GW Report.pdf 967K
Report.HW.130120.2017-06-08.2017 GW Report.pdf 1.3M
Report.HW.130120.2018-07-13.Annual GW Report.pdf 5.0M
Report.HW.130120.2018-09-10.NOIA Gas Ops Summary Report.pdf 1.4M
Report.HW.130120.2019-04-10.Summary of PSEG Utility Trenching.pdf 4.5M
Report.HW.130120.2020-09-04.Emergency Site Inspection Form.pdf 387K
Report.HW.130120.2020-10-02.Biennial GW Sampling Report.pdf 6.4M
Report.HW.130120.2020-11-16.Summary Report Substation Upgrades.pdf 1.3M
Report.HW.130120.2021-04-22.PRR 2018-2021.pdf 20M
Report.HW.130120.2021-07-19.Summary Report Emergency Excavation.pdf 1.9M
Report.HW.130120.2021-10-22.Gas Ops Test Holes IA Summry Report.pdf 806K
Report.HW.130120.2022-06-09.Site Inspection Form 2022.pdf 81K
Report.HW.130120.2022-07-19.Perimeter Fence Grounding and Camera Install.pdf 1.4M
Report.HW.130120.2022-08-05.Biennial GW Summary Report.pdf 11M
Report.HW.130120.2022-11-22.Summary Report Gate Station Test Pits.pdf 944K
Report.HW.130120.2022-11-22.Summary Report Utility Lot Excavation.pdf 1.0M
Report.HW.130120.2023-01-05.Summary Report IA Test Pits Entranceway.pdf 941K
Report.HW.130120.2023-03-09.IA Substation Camera Install Summary Report.pdf 1.2M
Report.HW.130120.2023-05-24.Fence Post Installation Summary Report.pdf 1.2M
Report.HW.130120.2023-06-23.IA Camera and Security Gate Excavation Summary.pdf 1.2M
Report.HW.130120.2023-07-19.Summary Report Switch Gear 2 and 3.pdf 2.8M
Report.HW.130120.2023-10-03.Emergency Inspection.pdf 7.8M
Report.HW.130120.2024-07-11.PRR 2021-2024.pdf 34M
Work Plan.HW.130120.2011-02-18.FinalSCWP_wappendices.pdf 32M
Work Plan.HW.130120.2013-03-15.Site Management Plan.pdf 39M
Work Plan.HW.130120.2022-09-15.SMP Rev 1.pdf 49M
Work Plan.NationalGrid Keyspan MGP.2008-12-23.Former Kent Ave Site Workplan.pdf 6.5M
Work Plan.NationalGrid Keyspan MGP.2010-04-30.Wallabout Channel & Navy Yark Basin Off-Site.pdf 1.9M
Work Plan.NationalGrid Keyspan MGP.2024-09-13.SWPH BMPs Work Plan.pdf 20M
Work Plan.NationalGrid Keyspan MGP.2024-09-19.SWPH Materials Management Plan.pdf 28M
Work Plan.NationalGrid Keyspan MGP.2024-10-18.SWPH Sediment Sampling Plan.pdf 703K