NYS Department of Environmental Conservation
File listing
Files for this location:
Name
Size
Application.BCP.C734138.2011-07-13.BMS_Restoration_Area.pdf
5.3M
Fact Sheet.BCP.C734138.2012-01-17.RIWP_comment_period.pdf
267K
Fact Sheet.BCP.C734138.2012-08-01.bldg_demo.pdf
1.1M
Report.BCP.C734138.2018-10-31.Trans Proj CCR 01 of 11 Text_Tables_Figures.pdf
18M
Report.BCP.C734138.2019-06-19.Bldg 3 VI Assessment.pdf
7.6M
Report.BCP.C734138.2019-07-23.Phase 1-2 RI Rpt - 01 of 14 - Text Tables Figures.pdf
30M
Report.BCP.C734138.2020-01-13.Bldg 22 PCB IRM CCR.pdf
5.1M
Report.BCP.C734138.2020-03-12.Hi Vac Pilot Test Report.pdf
11M
Report.BCP.C734138.2020-03-25.Bldg 25 Demo CCR - Text Tables FIgures.pdf
17M
Report.BCP.C734138.2020-03-31.GW PDI and Emerg Contams - All Except App B.pdf
27M
Report.BCP.C734138.2020-04-02.Bldg 25 Soil Excavation - Except Attach 5.pdf
9.6M
Report.BCP.C734138.2020-06-12.Addtl Well Install Rpt - 1 of 2 - Redacted.pdf
22M
Report.BCP.C734138.2021-02-05.FWRIA - All Exept App D.pdf
43M
Report.BCP.C734138.2021-10-05.Bldg 3 SVI Mitigation Report.pdf
18M
Report.BCP.C734138.2023-01-13.Supp GWMR.pdf
50M
Report.BCP.C734138.2023-07-28.Bldg 55 TISR GW Mon and System Perf_Q1 2022.pdf
21M
Report.BCP.C734138.2023-08-03.BLD 3 Post ATS Shutdown.pdf
704K
Report.BCP.C734138.2023-10-20.Bldg 55 IRM CCR_Appendix A through E.pdf
51M
Work Plan.BCP.C734138.2013-03-01.RIWP_1of3.pdf
67M
Work Plan.BCP.C734138.2014-10-21.Surface Soil Work Plan with Modifications.pdf
1.8M
Work Plan.BCP.C734138.2015-02-04.Phase 1A RIWP - GW Module - with Mod Letters.pdf
10M
Work Plan.BCP.C734138.2015-05-28.Phase 1A RIWP - Sediment Module with Approval Letter.pdf
1.4M
Work Plan.BCP.C734138.2016-02-10.TW Decomm Plan with Mods.pdf
1.1M
Work Plan.BCP.C734138.2016-02-12.Phase 1A RIWP - SVI Module - with Modifications.pdf
7.1M
Work Plan.BCP.C734138.2016-11-02.Bldg 22 Soil Sampling Plan.pdf
947K
Work Plan.BCP.C734138.2017-02-16.Phase 2 Groundwater RIWP - with Mods.pdf
8.9M
Work Plan.BCP.C734138.2019-04-17.Additional Sediment Sampling WP with Mods.pdf
1.8M
Work Plan.BCP.C734138.2019-10-15.Hi Vac Extraction Pilot Test WP.pdf
8.9M
Work Plan.BCP.C734138.2020-10-19.Bldg 55 IRM Pre-Design Investigation WP with Mods.pdf
7.9M
Work Plan.BCP.C734138.2021-04-15.Bldg 3 SVI Mitigation WP.pdf
2.4M
Work Plan.BCP.C734138.2021-06-04.Bldg 55 IRM Work Plan.pdf
29M
Work Plan.BCP.C734138.2021-11-02.Supplemental GW Investigation WP.pdf
2.2M
Work Plan.BCP.C734138.2022-03-18.Bldg 55 TISR OMM.pdf
110M
Work Plan.BCP.C734138.2022-04-19.Aldehyde Eval Addendum.pdf
15M
Work Plan.BCP.C734138.2022-05-02.Bldg 3 IA Treatment Sys OMM.pdf
11M
Work Plan.BCP.C734138.2022-05-18.Sediment Delineation WP with Modifications.pdf
14M
Work Plan.BCP.C734138.2023-05-15. Bldg 55 TISR Mod #2.pdf
23M
Work Plan.BCP.C734138.2023-10-20.Supp GWM_Addendum #2.pdf
405K