File listing

Files for this location:

NameSize
Report.HW.401068.1996-10-01.NETC Star Plaza Phase I ESA.pdf1.2M
Report.HW.401068.1996-11-29.NETC Addendum to Phase 1 ESA.pdf480K
Report.HW.401068.1997-10-27.IVI Phase I ESA.pdf2.1M
Report.HW.401068.1998-02-19.NETC Phase 2 ESA.pdf3.3M
Report.HW.401068.2002-06-18.PS Limited Phase II Subsurface Investigation.pdf5.0M
Report.HW.401068.2002-06-28.PS Phase 1 ESA.pdf 16M
Report.HW.401068.2003-02-04.CPI Limited Phase 2 Subsurface Investigation.pdf2.3M
Report.HW.401068.2012-10-01.HV Limited Environmental Investigation.pdf6.8M
Report.HW.401068.2013-02-28.NET Phase I ESA.pdf 25M
Report.HW.401068.2018-07-05.June 2018 Progress_Monitoring Report.pdf6.1M
Report.HW.401068.2019-04-30.Post-mitigation IA sampling report.pdf4.2M
Report.HW.401068.2020-07-07.SSDS Construction Completion Report (FINAL).pdf 54M
Report.HW.401068.2021-01-29.SSDS annual interim SM.pdf 16M
Work Plan.HW.401068.2014-01-15.IRM_work_plan.pdf4.0M
Work Plan.HW.401068.2019-02-28.Post-mitigation IA sampling WP.pdf165K
Work Plan.HW.401068.2020-05-13.Interim Site Management Plan for SSDS (FINAL).pdf 10M
Work Plan.HW.401068.2021-03-10.Supplemental IRM work plan (FINAL).pdf8.6M
Work Plan.HW.401068.2022-07-13.IRM work plan addendum (FINAL).pdf2.0M