NameSize
Consent Order.HW.224052.2008-05-22.Modification_Order_on_Consent.pdf718K
Easement.NationalGrid Keyspan MGP.2022-11-16.Recorded Environmental Easement - K Patchogue.pdf2.1M
Permit.NationalGrid Keyspan MGP.2024-06-17.SWPH Tidal Wetlands Permit .pdf1.0M
Report.HW.224052.2006-06-09.IRM CCR.pdf 12M
Report.HW.224052.2011-11-30.Remedial Investigation Work Plan.pdf 12M
Report.HW.224052.2016-11-23.Report.224052.2016-11-23.Greenpoint_interim RI_data Report_text tables figures.pdf 34M
Report.HW.224052.2018-06-26.LP_Area_Investigation_Report_w_Concurrence.pdf8.8M
Report.HW.224052.2020-12-03.Ballfield_UST_Invest_Summ_Rep_and_Approval.pdf9.2M
Report.HW.224052.2021-06-23.Additional_SVI_Sampling_Summary_w_Acceptance.pdf 17M
Report.HW.224052.2021-11-23.Ballfields_UST_Abandonment_Sum_Rep_w_Approvals.pdf274M
Report.HW.224052.2022-12-06.SV_PDI_Report_SSDS_Design.pdf8.9M
Work Plan.HW.224052.2004-10-21.SC WP.pdf 25M
Work Plan.HW.224052.2005-04-08.Air Monitoring.pdf762K
Work Plan.HW.224052.2009-01-09.PDI_WP_Cutoff_Wall_IRM.pdf1.7M
Work Plan.HW.224052.2012-06-13.FINAL-Greenpoint RI Work Plan with Cover Letter.pdf9.6M
Work Plan.HW.224052.2013-10-31.Phase_2&3_RIWP_w_Barrier_Wall_Letter.pdf205M
Work Plan.HW.224052.2013-10-31.RI WP Phase 2 and 3.pdf205M
Work Plan.HW.224052.2016-02-25.Phase 2_3 RI additional Investigation Plan.pdf5.4M
Work Plan.HW.224052.2017-11-01.Phase 3 SVI work plan.pdf2.2M
Work Plan.HW.224052.2018-02-13.Area 8 (Phase 3) work plan.pdf 10M
Work Plan.HW.224052.2020-02-27.Ballfield_UST_Invest_WP_and_Approval.pdf1.2M
Work Plan.HW.224052.2020-10-16.Excavation_Work_Plan.pdf266K
Work Plan.HW.224052.2020-12-21.Additional_SVI_Sampling_WP_w_Approvals.pdf4.9M
Work Plan.HW.224052.2021-02-23.Ballfield_UST_Removal_WP_w_Approvals.pdf7.0M
Work Plan.HW.224052.2021-05-27.Ballfield_SS_Sampling_WP_w_Approval.pdf1.4M
Work Plan.NationalGrid Keyspan MGP.2008-12-23.Former Kent Ave Site Workplan.pdf6.5M
Work Plan.NationalGrid Keyspan MGP.2010-04-30.Wallabout Channel & Navy Yark Basin Off-Site.pdf1.9M
Work Plan.NationalGrid Keyspan MGP.2024-09-13.SWPH BMPs Work Plan.pdf 20M
Work Plan.NationalGrid Keyspan MGP.2024-09-19.SWPH Materials Management Plan.pdf 28M
Work Plan.NationalGrid Keyspan MGP.2024-10-18.SWPH Sediment Sampling Plan.pdf703K