NYS Department of Environmental Conservation
File listing
Files for this location:
Name
Size
Application.HW.442046.2019-06-17.Request to Import Fill - IRM for Groundwater Capture and Treatment Civil Work.pdf
1.5M
Consent Order.HW.442046.2016-06-03.4-20160212-18.pdf
2.4M
Consent Order.HW.442046.2023-05-11.4-20160212-18_Amendment.pdf
3.2M
Fact Sheet.HW.442046.2019-04-01.Groundwater Capture IRM.pdf
1.2M
Fact Sheet.HW.442046.2019-04-08.IRM for Groundwater Capture and Treatment.pdf
1.2M
Fact Sheet.HW.442046.2019-07-03.IRM for Groundwater Capture and Treatment Addnl Info.pdf
1.2M
Fact Sheet.HW.442046.2021-04-21.FINAL-OU2 PRAP Release.pdf
954K
fact sheet.hw.442046.2021-12-03.FINAL-OU2 ROD Release McCaffrey Street.pdf
955K
Fact Sheet.HW.442046.2023-08-14.OU-2 McCaffrey St_Riverbank Stabilization FINAL.pdf
554K
Permit.HW.442046.2019-03-13.SPDES Permit Equivalent - Effluent Limitations and Monitoring Requirements - Final.pdf
312K
Permit.HW.442046.2024-02-05.FINAL - Water Quality Certification Permit OU-02.pdf
3.9M
Permit.HW.442046.2024-02-05.FINAL - Water Withdrawal Permit OU-02.pdf
791K
Permit.HW.442046.2025-09-04.McCaffrey St OU-1 IRM Permit Equivalency_09042025.pdf
199K
PRAP.hw.442046.2021-04-21.FINAL-OU-02.pdf
2.9M
Report.HW.442046.2017-07-06.FINAL - Hoosick Water Supply Study Groundwater Source Aquifer Evaluation.pdf
7.6M
Report.HW.442046.2017-07-06.FINAL - Hoosick Water Supply Study Groundwater Source Aquifer Evaluation Appendices.pdf
35M
Report.HW.442046.2019-08-01.IRM Groundwater Treatment Trial Results (2019-07-19 Sampling) Summary.pdf
154K
report.hw.442046.2019-08-29.DRAFT-Municipal Water Supply Study Report-Appx A and B.pdf
1.6M
report.hw.442046.2019-08-29.DRAFT-Municipal Water Supply Study Report-Appx C.pdf
40M
report.hw.442046.2019-08-29.DRAFT-Municipal Water Supply Study Report-Appx D.pdf
10M
report.hw.442046.2019-08-29.DRAFT-Municipal Water Supply Study Report-Appx E.pdf
288K
report.hw.442046.2019-08-29.DRAFT-Municipal Water Supply Study Report.pdf
11M
Report.HW.442046.2019-12-18.Hoosick Update Brief December2019 - MWSS Comment Summary.pdf
416K
Report.HW.442046.2020-12-07.FINAL-MWSS Report-01-Main Text.pdf
9.4M
Report.HW.442046.2020-12-07.FINAL-MWSS Report-02-App A - C att 2.pdf
9.8M
Report.HW.442046.2020-12-07.FINAL-MWSS Report-03-App C Att 3.pdf
15M
Report.HW.442046.2020-12-07.FINAL-MWSS Report-04-App C Att 4 - 13 thru E.pdf
17M
Report.HW.442046.2022-07-07.Data Summary Report for Regional SW and SED Sampling.pdf
5.0M
Report.HW.442046.2022-07-27.Phase 1 Regional Air Dep DSR.pdf
25M
Report.HW.442046.2022-07-27.Regional Air Dep Study DSR appendices .pdf
7.2M
Report.HW.442046.2022-09-02.Reg Air Dep Study_Supplemental_DSR.pdf
20M
Report.HW.442046.2023-10-01.Basis of Design - Water Supply Narrative.pdf
436K
ROD.HW.442046.2021-12-03.Operable Unit 2.pdf
2.8M
Work Plan.HW.442046.2016-08-02.FINAL-CP Plan for McCaffrey Street .pdf
2.8M
Work Plan.HW.442046.2016-08-30.FINAL-Remedial Investigation Feasibility Study Work Plan.pdf
63M
Work Plan.HW.442046.2017-02-27.Extruder Pit and Elevator Pit Water Removal and Sampling Program - Final.pdf
136K
Work Plan.HW.442046.2017-05-12.FINAL-Supplemental Hydrogeologic Investigations.pdf
1.6M
Work Plan.HW.442046.2017-08-28.FINAL-IRM Concept Plan - Groundwater Intercept Design.pdf
838K
Work Plan.HW.442046.2019-04-05.FINAL-IRM Groundwater Capture and Treatment Work Plan.pdf
30M
Work Plan.HW.442046.2019-08-23.FINAL-REDACTED for RELEASE-Hoosick Falls Air Deposition Study Work Plan.pdf
21M
Work Plan.HW.442046.2020-04-06.FINAL - MWSS Groundwater Option Data Gap WP.pdf
1.9M
Work Plan.HW.442046.2021-07-15.Air Dep Supplemental WP.pdf
1.4M
Work Plan.HW.442046.2021-11-16.regional SW Sed Sampling WP .pdf
1.5M
Work Plan.HW.442046.2022-10-14.McCaffrey OU-01 RIWP addendum.pdf
7.5M
Work Plan.HW.442046.2022-10-14.McCaffrey Street OU-01 RIWP addendum App A.pdf
7.0M
Work Plan.HW.442046.2022-10-14.McCaffrey Street OU-01 RIWP addendum App B.pdf
9.7M
Work Plan.HW.442046.2022-10-14.McCaffrey Street OU-01 RIWP addendum AppC.pdf
47K
Work Plan.HW.442046.2022-10-26.OU-2 McCaffrey St Geotechnical Investigation Work Plan-FINAL.pdf
2.2M
Work Plan.HW.442046.2024-05-15.Final OU-2 Groundwater Monitoring Plan.pdf
2.1M
Work Plan.HW.442046.2025-10-16.OU-01 2025 Monitoring WP_and Addendum_ADA_Final.pdf
8.6M
Work Plan.HW.442046.2026-04-30.OU-01 Supplemental SW+Sed Sampling.pdf
7.8M