NYS Department of Environmental Conservation
File listing
Files for this location:
Name
Size
Consent Order.HW.835012.1993-09-23.Crosman-RI_FS Consent Order.pdf
1.4M
Consent Order.HW.835012.1994-11-14.Hazardous Waste Violation Consent Order.pdf
225K
Consent Order.HW.835012.1998-03-25.RD_RA Consent Order.pdf
1.1M
Easement.HW.835012.2020-05-04.Executed Covenants and Restrictions.pdf
649K
Fact Sheet.HW.835012.2022-06-15.2-4 Reclass Notice.pdf
596K
Permit.HW.835012.2025-10-21.SPDES Permit Equivalent.pdf
420K
Report.HW.835012.1998-08-28.Final Engineering Report - Soil Vapor Extraction.pdf
436K
Report.HW.835012.2010-07-01.Crosman-Off-site-SoilVaporInvestigation.pdf
3.2M
Report.HW.835012.2010-12-01.Semiannual-GW-Monitoring.pdf
2.8M
Report.HW.835012.2012-01-01.Semiannual-GW-Monitoring.pdf
1.2M
Report.HW.835012.2013-12-18.December 2013 Semi-Annual Groundwater Monitoring Report.pdf
1.4M
Report.HW.835012.2014-04-29.On-site SVI Report.pdf
6.3M
Report.HW.835012.2014-09-23.West Site Soil Boring Results.pdf
179K
Report.HW.835012.2014-12-29.Semi-Annual Groundwater Monitoring Report 12-14.pdf
1.2M
Report.HW.835012.2015-12-15.Crosman SSDS 100% Design Drawings.pdf
5.5M
Report.HW.835012.2015-12-17.December 2015 Semi-annual Groundwater Monitoring.pdf
2.0M
Report.HW.835012.2016-06-24.June 2016 Semi-annual Groundwater Monitoring.pdf
1.7M
Report.HW.835012.2016-12-27.December 2016 Semi-annual Groundwater Monitoring.pdf
2.0M
Report.HW.835012.2017-01-31.Sub-Slab Depresurization Construction Completion Report.pdf
19M
Report.HW.835012.2017-03-31.Post Mitigation Indoor Air Sample Results.pdf
5.0M
Report.HW.835012.2017-12-15.2017 - Groundwater Monitoring Report.pdf
2.5M
Report.HW.835012.2020-05-13.April 2020 - Groundwater Monitoring Report.pdf
2.3M
Report.HW.835012.2020-06-20.Periodic Review Report - 2020.pdf
1.6M
Report.HW.835012.2020-09-11.PFAS Emerging Contaminant Assessment Report .pdf
1.4M
Report.HW.835012.2020-12-10.October 2020 Groundwater Monitoring Report.pdf
1.9M
Report.HW.835012.2021-04-09.Crosman - Soil Vapor Intrusion-Final Engineering Report.pdf
36M
Report.HW.835012.2022-02-01.Periodic Review Report 2022.pdf
8.6M
Report.HW.835012.2023-07-11.(PRR) Periodic Review Report and Letter.pdf
12M
Report.HW.835012.2023-11-13.Semi-annual groundwater report.pdf
2.2M
Report.HW.835012.2024-07-05.2024 PRR and Letter.pdf
5.7M
Report.HW.835012.2025-06-30.Sampling Outfall-001.pdf
81M
Report.HW.835012.2025-07-21.2025 PRR and Letter.pdf
6.7M
ROD.HW.835012.1997-03-01.crosman_corporation.pdf
726K
Work Plan.HW.835012.1997-05-15.Remedial Action Work Plan.pdf
12M
Work Plan.HW.835012.2013-12-30.Vapor Intrusion Investigation Workplan.pdf
343K
Work Plan.HW.835012.2014-06-11.Supplemental West-side Soil Boring Work Plan.pdf
407K
Work Plan.HW.835012.2014-06-11.West-side Soil Boring Workplan.pdf
407K
Work Plan.HW.835012.2021-04-13.Site Management Plan (SMP).pdf
32M