NYS Department of Environmental Conservation
File listing
Files for this location:
Name
Size
Permit.HW.314001.2009-11-16.Part_373_Permit_w_bookmarks.pdf
95M
PRAP.HW.314001.2007-03-14.Statement_of_Basis.pdf
57M
Report.HW.314001.1981-06-01.Environmental Assessment of Waste Oil Leach Field.pdf
12M
Report.HW.314001.1981-07-01.Environmental Assessment of Building 001 and 004 Area.pdf
13M
Report.HW.314001.1984-04-01.Remedial Action at the Main Plant Site.pdf
5.7M
Report.HW.314001.1985-02-01.Site Gravel Supplement - Final Groundwater Report - Main Plant Site.pdf
14M
Report.HW.314001.1991-12-11.H107 TCE Concentration Reduction Study, Final Report.pdf
34M
Report.HW.314001.1992-08-26.RCRA Facility Assessment Report - FINAL.pdf
18M
Report.HW.314001.1997-12-12.Groundwater RFI Report.pdf
427M
Report.HW.314001.1997-12-18.RFI (Soils) - Former Antenna Drum Storage Area.pdf
15M
Report.HW.314001.1998-02-17.RFA-SV (Soils) for Nine SWMUs.pdf
45M
Report.HW.314001.1998-04-09.RFA-SV_B006 Truck Crib Sump.pdf
2.9M
Report.HW.314001.1999-03-31.Corrective Measures Study.pdf
63M
Report.HW.314001.1999-06-30.RFI (Soils) - Former Equipment Crusher Release Pathway.pdf
29M
Report.HW.314001.1999-10-11.Groundwater Collection and Conveyance System, 100% Submittal.pdf
58M
Report.HW.314001.2000-11-15.Corrective Measures Implementation Report.pdf
30M
Report.HW.314001.2000-12-22.ICM Implementation Report - Former Equipment Crusher Release Pathway.pdf
8.3M
Report.HW.314001.2011-12-20.AOC_E_Perimeter_Rd_Drum_Area.pdf
4.2M
Report.HW.314001.2013-05-01.RFI_VI_B003_Findings.pdf
10M
Report.HW.314001.2013-07-18.New_AOC_F_Assessment_Report.pdf
4.4M
Report.HW.314001.2014-02-24.RFI_VI_B003_SVE_System_Perf_Eval.pdf
7.9M
Report.HW.314001.2014-04-21.Report of Findings_ Bldg 001 VOC Source Assessment.pdf
8.7M
Report.HW.314001.2014-10-31.VOC Source Assessment and Confirmatory Indoor Air Sampling - B002, B004, B008, B012, B077, B416.pdf
9.8M
Report.HW.314001.2020-04-29.2019_Annual_GW_Rpt.pdf
14M
Report.HW.314001.2020-11-09.IBM Poughkeepsie PMP rpt.pdf
73M
Report.HW.314001.2022-03-31.2021_VI_EC_POK_Annual_Rpt.pdf
3.6M
Report.HW.314001.2024-03-14.2023_POK_VI_EC_PMP_Annual_Rp.pdf
4.7M