File listing

Files for this location:

NameSize
Fact Sheet.HW.704024.1998-11-01.Fact Sheet.pdf 83K
Fact Sheet.HW.704024.2002-08-01.Fact Sheet.pdf108K
PRAP.HW.704024.2000-02-09.Proposed remedial action plan .pdf1.5M
Report.HW.704024.1990-10-01.Environmental Site Investigation.pdf2.4M
Report.HW.704024.1991-08-29.Phase II Environmental Site Investigation .pdf3.9M
Report.HW.704024.1992-12-01.Final Report_Dec_1992_DEM-East_Phase_III_Investigation_Rpt.pdf3.4M
Report.HW.704024.1993-04-01.GW Treatment System Engineering Report.pdf3.6M
Report.HW.704024.1995-03-01.Operation Report On-site GW Recovery and treatment system .pdf6.8M
Report.HW.704024.1997-08-22.GW Treatment System Engineering Report.pdf5.8M
Report.HW.704024.1998-05-08.Baseline Summary report .pdf 50M
Report.HW.704024.1998-05-22.RI_FS scope of work .pdf946K
Report.HW.704024.2000-06-01.Feasibility Study .pdf5.6M
Report.HW.704024.2000-06-01.Remedial Investigation.pdf 80M
Report.HW.704024.2002-04-01.Remedial_Design_Package.pdf 21M
Report.HW.704024.2007-07-02.Vapor Intrusion Evaluation_Redacted.pdf 11M
Report.HW.704024.2012-05-03.RDWP for SSDS.pdf3.9M
Report.HW.704024.2014-01-24.PRR_2013.pdf493M
Report.HW.704024.2015-01-08.PRR_2014.pdf 52M
Report.HW.704024.2016-02-02.PRR_2015.pdf 76M
Report.HW.704024.2017-01-06.PRR_2016.pdf 91M
Report.HW.704024.2018-01-23.PRR_2017.pdf 16M
Report.HW.704024.2018-10-23.Emerging Contaminant Sampling Results.pdf 31M
Report.HW.704024.2019-01-14.PRR_2018.pdf 11M
Report.HW.704024.2020-01-28.PRR_2019.pdf 13M
Report.HW.704024.2021-01-01.PRR_2020.pdf 17M
Report.HW.704024.2023-01-01.PRR_2022.pdf 13M
Report.HW.704024.2024-01-01.PRR_2023.pdf 16M
Report.HW.704024.2025-01-31.PRR_2024.pdf 23M
Report.HW.704024.2026-01-30.2025_PRR.pdf 54M
Report.HW.704024.2026-01-30.2025_PRRCert.pdf387K
ROD.HW.704024.2000-03-01.binghamton_plastics.pdf1.3M
Work Plan.HW.704024.1992-06-10.Phase III Investigation Work Plan.pdf4.0M
Work Plan.HW.704024.1998-11-11.RI_FS work plan.pdf 17M
Work Plan.HW.704024.2001-04-26.Remedial Design Work Plan.pdf3.7M