NYS Department of Environmental Conservation
File listing
Files for this location:
Name
Size
Decision Document.HW.734054.2021-02-02.SR002 ROD_FINAL SIGNED.pdf
8.1M
Fact Sheet.HW.734054.2011-11-01.MMRP_Phase2_SiteEvaluation.pdf
1.4M
PRAP.HW.734054.2010-07-26.Proposed Plan_Site_15_ERP.pdf
1.4M
PRAP.HW.734054.2016-05-11.Hancock_Field-Draft_Final_Proposed_Plan-MRS_SR001.pdf
636K
PRAP.HW.734054.2020-09-29.SR002 Proposed Plan.pdf
7.7M
Report.HW.734054.1989-06-01.IRP_PHASEII_CONFIRMATIONQUANTIFICATION.pdf
109M
Report.HW.734054.1994-05-13.IRP_DRAFT_CONFIRMATORYSTUDYSAMPLING_AND_ANALYSISPLAN.pdf
13M
Report.HW.734054.1995-02-01.SITEINVESTIGATIONPETROLEUMOILLUBRICATIONAREAPESTICIDESTORAGEAREA.pdf
102M
Report.HW.734054.1995-11-01.TECHNICALMEMORANDUMPESTICIDESTORAGEAREA6_DRAFTFINAL.pdf
13M
Report.HW.734054.1996-06-01.ENVIRONMENTALASSESSMENT.pdf
45M
Report.HW.734054.1997-03-01.RIR_PETROLEUMOILLUBRICANTFACILITYSITE15_DRAFTFINAL.pdf
63M
Report.HW.734054.1998-04-01.ENVIRONMENTALBASELINESURVEY.pdf
21M
Report.HW.734054.2001-08-01.SUBSURFACEINVESTIGATIONREPORTFORMERLEACHFIELD.pdf
30M
Report.HW.734054.2001-11-07.TCRA_DESIGNSITE15.pdf
44M
Report.HW.734054.2002-02-01.FS Site 15.pdf
8.2M
Report.HW.734054.2003-02-01.SITEASSESSMENTREPORTSITE1SITE4SITE9SITE10SITE11AOC1_3.pdf
141M
Report.HW.734054.2003-06-01.RemovalActionReport_Sites1and15.pdf
70M
Report.HW.734054.2004-01-29.PRAP_SITE15.pdf
43M
Report.HW.734054.2004-09-01.Site_Inspection_Report_TM_Sites_1-4-9-11-AOC-P.pdf
2.6M
Report.HW.734054.2005-02-08.Site_Inspection_Report_for_Site_10.pdf
587K
Report.HW.734054.2007-01-30.Site15_BTEX_Plume_Delineation.pdf
53M
Report.HW.734054.2007-06-01.Draft Site Investigation TechMemo_Sites1and4.pdf
5.9M
Report.HW.734054.2007-06-01.SiteInspection_TechMemo_Sites1and4.Draft.pdf
1.4M
Report.HW.734054.2008-06-01.Site15_IRA_SupplementalRI_PlumeDelineation_TechMemo.pdf
79M
Report.HW.734054.2008-07-02.ENGINEERING_EVALUATION.pdf
21M
Report.HW.734054.2008-11-24.Draft_Final_Construction_Completion-Site15-Soil_Removal.pdf
58M
Report.HW.734054.2009-01-12.Final_Construction_Completion_IRA_SoilRemoval.pdf
52M
Report.HW.734054.2009-09-01.MMRP-Program_Hancock_Field_Final_CSE_Phase_1.pdf
22M
Report.HW.734054.2010-03-01.Final_FFS_Report.pdf
8.3M
Report.HW.734054.2010-03-01.Final_Supplemental_RI_TM-PilotTest.pdf
27M
Report.HW.734054.2010-10-25.ProjectCloseoutRep_Sites1_2_3_4.pdf
2.3M
Report.HW.734054.2011-08-01.Final_Site_15_Data_Gap_TM-August-2011.pdf
28M
Report.HW.734054.2011-08-01.Site15DataGapInvestigation.zip
255M
Report.HW.734054.2012-01-20.BioSparge_Update-Analysis_of_LNAPL_in_MW-101.pdf
1.3M
Report.HW.734054.2012-02-01.MMRP-Program_Field_CSE_Phase_II_Draft_Final-Appendicies.pdf
13M
Report.HW.734054.2012-02-01.MMRP-Program_Field_CSE_Phase_II_Draft_Final.pdf
3.5M
Report.HW.734054.2012-04-10.RCRA_CA725.pdf
1.4M
Report.HW.734054.2012-11-15.MMRP comprehensive Site Evaluation.pdf
12M
Report.HW.734054.2013-04-01.Draft_Final_Jan2013_Periodic_GW_Report.pdf
13M
Report.HW.734054.2013-04-04.MMRP_Removal Action Memorandum.pdf
13M
Report.HW.734054.2013-04-10.SR001 and SR002.pdf
14M
Report.HW.734054.2013-12-01.Draft_Final_Hancock_Periodic_GW_Report.pdf
7.4M
Report.HW.734054.2014-09-01.Site 15 Final Engineering Report (FER).pdf
1.9M
Report.HW.734054.2015-05-15.May 2015- Hancock_Field_ANGB_Final_PASI_Report.pdf
118M
Report.HW.734054.2015-12-01.Hancock_Field_ANG-Draft_Final_PFC_PASI_report.pdf
6.2M
Report.HW.734054.2016-03-01.Hancock_Field-Final_NTCRA_MMRP_Firing_Range_Cleanup_Report_for_MRS-SR001andSR002.pdf
23M
Report.HW.734054.2019-03-07.PFAS SI.pdf
26M
Report.HW.734054.2020-03-23.RI Tech Memo.pdf
174M
Report.HW.734054.2020-07-29.SR002 Report Final.pdf
18M
Report.HW.734054.2025-04-10.March_2025_MPR_(TU019).pdf
164K
Report.HW.734054.2025-05-28.April_2025_MPR_(TU019).pdf
181K
Report.HW.734054.2025-06-01.June_2025_MPR.pdf
219K
Report.HW.734054.2025-07-01.July_2025_MPR.pdf
739K
Report.HW.734054.2025-07-26.May_2025_MPR.pdf
165K
Report.HW.734054.2025-08-01.August_2025_MPR.pdf
197K
Report.HW.734054.2026-02-28.Feb_2026_MPR.pdf
264K
ROD.HW.734054.2011-04-01.Site15_Signed_ROD.pdf
1.5M
ROD.HW.734054.2016-08-03.SR001 ROD.pdf
2.4M
Work Plan.HW.734054.1995-06-01.FINALREMEDIALINVESTIGATIONWORKPLANSAMPLINGANDANALYSISPLAN.pdf
115M
Work Plan.HW.734054.2000-12-01.WORKPLANDATAGAPINVESTIGATIONFOCUSEDFEASIBILITYSTUDYSITE15.pdf
161M
Work Plan.HW.734054.2001-10-25.TCRA_SITE15.pdf
78M
Work Plan.HW.734054.2007-07-01.Site15_IRA_Supplemental_RI_WorkPlan.pdf
4.0M
Work Plan.HW.734054.2007-07-10.ERM_Supplemental_Investigation_Remedial_Workplan.pdf
4.0M
Work Plan.HW.734054.2008-07-01.Site15_IRA_FinalRA_WorkPlan_SoilRemoval.pdf
8.5M
Work Plan.HW.734054.2008-10-01.Site15_IRA_SupplementalRI_and_PilotTest_WorkPlan.pdf
8.9M
Work Plan.HW.734054.2010-07-01.Project_Closeout_Workplan-Sites1_2_3_4.pdf
4.0M
Work Plan.HW.734054.2010-08-01.ADDENDUMSITE15SUPPLEMENTALRI_PILOTTEST.pdf
100M
Work Plan.HW.734054.2010-08-01.Supp_RI_SVI_DataGap_WorkPlan.pdf
4.9M
Work Plan.HW.734054.2011-02-01.Final_Community_Involvement_Plan.pdf
851K
Work Plan.HW.734054.2011-09-20.REMEDIALACTIONSITE15.pdf
174M
Work Plan.HW.734054.2013-12-18.MMRP-Hancock_Field_Final_NTCRA_WP.pdf
29M
Work Plan.HW.734054.2014-02-27.Hancock_ANG_Draft_Final_PASI_WorkPlan.pdf
19M
Work Plan.HW.734054.2014-05-05.MMRP- FINAL NTCRA Work Plan Addendum report.pdf
18M
Work Plan.HW.734054.2016-05-11.Final RIWP-UFP-QAPP_Site-TU019.pdf
39M
Work Plan.HW.734054.2017-12-08.Final PFAS Work Plan- Dec. 2017.pdf
13M
Work Plan.HW.734054.2019-03-15.MMRP-SR002.pdf
11M
Work Plan.HW.734054.2024-06-12.TU019-QAPP-RIWP_TU019-DRAFT.pdf
144M
Work Plan.HW.734054.2025-01-10.UFP-QAPP (TU019) SRI Work Plan (Dec 2024) - FINAL.pdf
140M