NYS Department of Environmental Conservation
File listing
Files for this location:
Name
Size
Consent Order.HW.738029.1988-01-22.Interim.pdf
1.5M
Consent Order.HW.738029.1988-01-22.Orders on Consent and Cover Letters .pdf
3.5M
Consent Order.HW.738029.1990-03-29.Amendment to Order_Well 2 IRM_AWS.pdf
545K
Consent Order.HW.738029.1990-04-23.RI-FS.pdf
589K
Consent Order.HW.738029.1991-08-12.IRMs_Long-term DW_Temp Pumping.pdf
1.1M
Consent Order.HW.738029.1995-12-11.Design_Remedial Action.pdf
903K
Consent Order.HW.738029.2012-10-19.Riccelli R7 salt clean up.pdf
550K
Easement.HW.738029.2000-12-01.Deed_MBC_Coolidge Fulton LLC.pdf
1.0M
Easement.HW.738029.2015-06-23.deed restriction.pdf
1.1M
Fact Sheet.HW.738029.2003-08-01.ESD.pdf
150K
PRAP.HW.738029.1994-11-02.PRAP.pdf
611K
Report.HW.738029.1990-08-08.Shallow Soil Gas and Storm Sewer Water Investigation.pdf
339K
Report.HW.738029.1993-07-01.RI_Volume I.pdf
5.8M
Report.HW.738029.1993-07-31.RI_Volume III_Addendum_App P_R_S_V_W.pdf
45M
Report.HW.738029.1994-07-31.Feasibility_Study.pdf
17M
Report.HW.738029.1994-09-30.FS Revisions.pdf
2.0M
Report.HW.738029.1995-05-01.Remedial Design_Malcolm Pirnie.pdf
5.4M
Report.HW.738029.1995-09-11.Remedial Design Addendum_Earth Tech .pdf
258K
Report.HW.738029.1997-06-03.Oil and Grease Exceedance.pdf
897K
Report.HW.738029.1997-11-28.FER_Earth Tech.pdf
6.8M
Report.HW.738029.2000-05-01.Chrysteel Phase I ESA.pdf
1.7M
Report.HW.738029.2000-06-20.Chrysteel Phase II ESA.pdf
648K
Report.HW.738029.2000-10-09.Permeable Reactive Wall Pilot Test Results_URS.pdf
15M
Report.HW.738029.2002-12-20.Supp PRB Design Investigation.pdf
1.3M
Report.HW.738029.2002-12-20.Supp PRB Design Investigation_Appendices.pdf
143K
Report.HW.738029.2003-03-01.90% PRB Remedial Design_URS.pdf
1.4M
Report.HW.738029.2003-10-16.Final Design.pdf
11M
Report.HW.738029.2003-10-16.Final Design AppB_90% PRB Design Basis.pdf
3.5M
Report.HW.738029.2006-07-24.SVI Study_OBG.pdf
4.0M
Report.HW.738029.2006-07-24.SVI Study_Onsite Results Figure_OBG.pdf
3.9M
Report.HW.738029.2008-08-01.AGWR_Year 11 w MIPs.pdf
5.5M
Report.HW.738029.2010-07-29.100% Remedial Design_SVE_Enhanced GW.pdf
21M
Report.HW.738029.2012-08-16.FER_SVE CCR_AECOM.pdf
1.0M
Report.HW.738029.2012-08-16.FER_SVE CCR_Appendices.pdf
49M
Report.HW.738029.2012-10-16.Supplemental Soil Investigation_Geologic.pdf
1.3M
Report.HW.738029.2013-02-21.AGMR_Year 15_5-yr Review.pdf
16M
Report.HW.738029.2014-01-21.Approved_Boundary_Modification_Pkg.pdf
1.0M
Report.HW.738029.2016-10-28.SMP and Appendices A thru G.pdf
25M
Report.HW.738029.2016-10-28.SMP_MW Construction Details.pdf
23K
Report.HW.738029.2016-10-28.SMP_Water Level Measurement Table.pdf
72K
Report.HW.738029.2019-06-25.PRR 2018 to 2019.pdf
3.8M
Report.HW.738029.2019-07-15.May 19 GWTF .pdf
173K
Report.HW.738029.2019-08-07.June 19 GWTF .pdf
173K
Report.HW.738029.2019-10-22.July 19 GWTF.pdf
183K
Report.HW.738029.2019-10-25.GWTF August 19 .pdf
173K
Report.HW.738029.2019-12-09.GWTF October 19 .pdf
183K
Report.HW.738029.2019-12-09.GWTF September 19 .pdf
173K
Report.HW.738029.2020-01-08.GWTF November 19 .pdf
173K
Report.HW.738029.2020-01-17.EC Sampling results .pdf
621K
Report.HW.738029.2020-01-31.GWTF December 19 .pdf
173K
Report.HW.738029.2020-05-18.February 2020 GWTF .pdf
172K
Report.HW.738029.2020-05-18.January 2020 GWTF.pdf
183K
Report.HW.738029.2020-05-27.PRR April 2019 to April 2020.pdf
4.2M
Report.HW.738029.2020-05-28.March 2020 GWTF .pdf
111K
Report.HW.738029.2020-06-22.April 2020 GWTF .pdf
172K
Report.HW.738029.2020-07-16.June 2020 GWTF .pdf
172K
Report.HW.738029.2020-07-16.May 2020 GWTF .pdf
172K
Report.HW.738029.2020-08-10.July 2020 GWTF .pdf
183K
Report.HW.738029.2020-09-09.August 2020 GWTF.pdf
173K
Report.HW.738029.2020-11-09.2020 GWTF September .pdf
173K
Report.HW.738029.2021-02-01.Dec 2020 GWTF.pdf
173K
Report.HW.738029.2021-02-01.Nov 2020 GWTF.pdf
173K
Report.HW.738029.2021-02-01.Oct 2020 GWTF.pdf
122K
Report.HW.738029.2021-02-23.Jan 2021 GWTF .pdf
183K
Report.HW.738029.2021-05-26.PRR April 2020 to April 2021.pdf
7.7M
Report.HW.738029.2021-07-09.Feb 2021 GWTF .pdf
112K
Report.HW.738029.2021-07-16.Mar Apr 2021 GWTF .pdf
189K
Report.HW.738029.2021-11-15.May-Aug 2021 GWTF.pdf
203K
Report.HW.738029.2022-01-24.Sept-Dec 2021 GWTF .pdf
202K
Report.HW.738029.2022-05-24.PRR April 2021 to April 2022.pdf
7.3M
Report.HW.738029.2023-07-28.PRR April 2022 to April 2023.pdf
13M
Report.HW.738029.2024-05-28.PRR_April 2023 to April 2024.pdf
11M
ROD.HW.738029.1995-03-20.ROD.pdf
1.2M
ROD.HW.738029.2003-07-02.Explanation of Significant Differences.pdf
166K
Work Plan.HW.738029.1996-08-07.Recovery Well Development Proposal.pdf
441K
Work Plan.HW.738029.1999-11-08.Pilot Test Work Plan.pdf
15M
Work Plan.HW.738029.2001-07-10.Effleunt Stack Upgrade Work Plan.pdf
485K
Work Plan.HW.738029.2001-07-10. SVE System Removal Work Plan.pdf
340K
Work Plan.HW.738029.2001-07-10.Vapor Phase Carbon Removal Work Plan.pdf
343K
Work Plan.HW.738029.2002-04-26.Proposal for Install or PRB System_URS.pdf
2.2M
Work Plan.HW.738029.2003-09-30.Design_Construction WP.pdf
3.3M
Work Plan.HW.738029.2004-09-01.Pilot Study Enhanced Anaeorbic Biodregadation.pdf
786K
Work Plan.HW.738029.2009-11-30.Remedial Optimization_SVE.pdf
6.3M
Work Plan.HW.738029.2019-06-10.PFAS Sampling Work Plan .pdf
1.9M