File listing

Files for this location:

NameSize
Consent Order.HW.152040.1990-03-26.Consent Order_Huntington Landfill.pdf8.1M
Consent Order.HW.152040.2004-12-02.CONSENT ORDER - BAE Systems Aerospace, Inc. et al.pdf315K
Consent Order.HW.152040.2004-12-02.CONSENT ORDER - Waste Management.pdf250K
Decision Document.HW.152040.1994-01-19.Interim_Remedial_Program_Decision_Document.pdf1.1M
Report.HW.152040.1900-01-01.Monthly_Landfill_Gas_Reports_2002_through_2007.pdf5.9M
Report.HW.152040.1994-05-01.Perimeter Landfill Gas Collection System - As Builts - Huntington Landfill.pdf146M
Report.HW.152040.1996-01-01.Certification Report Interim Remedial Program Volume II.pdf8.0M
Report.HW.152040.1996-01-01.Certification report Interim Remedial Program Volume III.pdf6.5M
Report.HW.152040.1996-01-01.Certification report Interim Remedial Program Volume IV.pdf 36M
Report.HW.152040.1996-01-01.Final Closure Report Construction Quality Assurance.pdf 15M
Report.HW.152040.1996-03-01.Site Summary and Work Plan Package_OCRD.pdf672K
Report.HW.152040.1996-07-01.Construction Qualith Assurance Final Report Volume II.pdf 27M
Report.HW.152040.1996-07-01.Construction Quality Assurance Final Closure System Final Rep Volume IV.pdf 31M
Report.HW.152040.1996-07-01.Construction Quality Assurance Final Report Final Vol VII.pdf 14M
Report.HW.152040.1996-07-01.Construction Quality Assurance Final Report Vol VIII.pdf 23M
Report.HW.152040.1996-07-01.Construction Quality Assurance Volume IX Final Report.pdf 23M
Report.HW.152040.1996-07-01.Construction Quality Assurance Volume VI Final Report.pdf 19M
Report.HW.152040.1996-07-01.Final Report Construction Qualith Assurance Volume V.pdf 33M
Report.HW.152040.1996-07-01.Final Report Construction Quality Assurance Volume III.pdf 31M
Report.HW.152040.1996-11-01.Post_Closure_Operation_and_Maintanence_Plan_Volume_2.pdf9.0M
Report.HW.152040.1996-11-01.Post_Closure_Operation_and_Maintenance_Plan_Volume_1.pdf 11M
Report.HW.152040.1996-11-01.Post_Closure_Operation_and_Maintenance_Plan_Volume_3.pdf5.3M
Report.HW.152040.1999-11-17.reclass_decision_2_to_4.pdf766K
Report.HW.152040.2000-07-28.Periodic_Review.pdf 52K
Report.HW.152040.2001-07-26.Periodic_Review.pdf234K
Report.HW.152040.2001-09-01.Groundwater and Surface Water .pdf5.4M
Report.HW.152040.2002-04-01.Inactive Haz Waste Disposal Report & Site Figure-LFGM&CS.pdf300K
Report.HW.152040.2002-09-01.gw_sw_monit.pdf410K
Report.HW.152040.2002-09-25.Public_Health_Assessment.pdf1.6M
Report.HW.152040.2003-01-01.4thQ_Town_Inspection.pdf325K
Report.HW.152040.2003-04-01.gw_sw_monit.pdf952K
Report.HW.152040.2003-12-10.4th_quarterly_insp.pdf219K
Report.HW.152040.2004-01-01.ASTDR_Health_Assessment.pdf299K
Report.HW.152040.2004-02-04.1st_Quarterly_Insp.pdf325K
Report.HW.152040.2004-02-04.East Northport LF SIR_ocrd.pdf246K
Report.HW.152040.2004-04-20.Quarterly_Insp.pdf778K
Report.HW.152040.2004-04-23.OMM Review Report & Site Description_ocrd.pdf145K
Report.HW.152040.2004-04-23.Periodic_Review.pdf 58K
Report.HW.152040.2004-05-01.LF_gas_monitoring.pdf3.3M
Report.HW.152040.2004-06-01.gw_sw_monit.pdf679K
Report.HW.152040.2004-06-01.LF_gas_monitoring.pdf3.5M
Report.HW.152040.2004-06-24.2nd_Quarterly_Insp.pdf785K
Report.HW.152040.2004-09-15.3rd_quarterly_insp.pdf227K
Report.HW.152040.2004-10-01.gw_sw_monit.pdf793K
Report.HW.152040.2004-11-12.lf_gas_monitoring_jul-dec_2004.pdf3.0M
Report.HW.152040.2004-12-09.4th_quarterly_insp.pdf210K
Report.HW.152040.2005-03-30.lf_gas_monitoring_jan-jun_2005.pdf2.9M
Report.HW.152040.2005-04-01.gw_sw_monit.pdf902K
Report.HW.152040.2005-04-18.1st_quarterly_insp.pdf204K
Report.HW.152040.2005-06-28.2nd_quarterly_insp.pdf221K
Report.HW.152040.2005-09-07.3rd_quarterly_insp.pdf238K
Report.HW.152040.2005-10-28.lf_gas_monitoring_jul-sept_2005.pdf3.6M
Report.HW.152040.2005-11-21.gw_sw_monitoring_jul-dec_2005.pdf 10M
Report.HW.152040.2005-12-06.4th_quarterly_insp.pdf226K
Report.HW.152040.2006-01-01.Discussion Methane Monitoring Data_OCRD.pdf2.8M
Report.HW.152040.2006-03-22.1st_Quarterly_Inspection.pdf2.1M
Report.HW.152040.2006-06-12.2nd_Quarterly_Insp.pdf503K
Report.HW.152040.2006-07-06.LF_Gas_Monit_Jan_through_June_2006.pdf 23M
Report.HW.152040.2006-08-01.GW_SW_Monit.pdf 55M
Report.HW.152040.2006-09-01.LF_gas_monitoring.pdf453K
Report.HW.152040.2006-09-21.3rd_Quarterly_Insp.pdf445K
Report.HW.152040.2006-09-29.Vapor_intrusion_Investigation.pdf 20M
Report.HW.152040.2006-10-01.GW_SW_Monit.pdf 55M
Report.HW.152040.2006-10-01.LF_gas_monitoring.pdf855K
Report.HW.152040.2006-10-26.LF_Gas_Monit_Jul-Aug_2006.pdf503K
Report.HW.152040.2006-11-01.GW_and_SW_Monit.pdf4.3M
Report.HW.152040.2006-11-01.LF_gas_monitoring.pdf454K
Report.HW.152040.2006-11-15.4th_Quarterly_Insp.pdf234K
Report.HW.152040.2006-12-01.LF_gas_monitoring.pdf422K
Report.HW.152040.2007-01-01.LF_gas_monitoring.pdf444K
Report.HW.152040.2007-02-01.LF_gas_monitoring.pdf450K
Report.HW.152040.2007-02-21.1st_Quarterly_Insp.pdf 84K
Report.HW.152040.2007-03-01.LF_gas_monitoring.pdf450K
Report.HW.152040.2007-04-01.LF_gas_monitoring.pdf480K
Report.HW.152040.2007-05-17.2nd_Quarterly_Insp.pdf 72K
Report.HW.152040.2007-07-01.GW_and_SW_Monit.pdf3.0M
Report.HW.152040.2007-08-16.3rd_Quarterly_Insp.pdf 94K
Report.HW.152040.2007-09-04.LF_Gas_Monit_May-July_2007.pdf844K
Report.HW.152040.2007-11-01.GW_SW_Monitoring.pdf3.9M
Report.HW.152040.2007-11-13.Qtrly_Insp.pdf 52K
Report.HW.152040.2007-12-05.LF_Gas_Monit_Aug-Oct_2007.pdf645K
Report.HW.152040.2008-02-11.LF_Gas_Monit_Nov_Dec_2007.pdf506K
Report.HW.152040.2008-02-11.Qrtly_Insp.pdf 51K
Report.HW.152040.2008-06-02.GW_SW_Monitor.pdf3.3M
Report.HW.152040.2008-06-02.LF_Gas_Monitor_April_2008.pdf273K
Report.HW.152040.2008-06-02.LF_Gas_Monitor_February_2008.pdf284K
Report.HW.152040.2008-06-02.LF_Gas_Monitor_January_2008.pdf280K
Report.HW.152040.2008-06-02.LF_Gas_Monitor_March_2008.pdf283K
Report.HW.152040.2008-06-02.Second_Quarter_QIR.pdf193K
Report.HW.152040.2008-08-14.QIR_3rd_Quarter.pdf 71K
Report.HW.152040.2008-09-01.GW_SW_Monit.pdf3.6M
Report.HW.152040.2008-09-26.LFI_Gas_Monitor_July_2008.pdf291K
Report.HW.152040.2008-09-26.LF_Gas_Monitor_June_2008.pdf313K
Report.HW.152040.2008-09-26.LF_Gas_Monitor_May_2008.pdf337K
Report.HW.152040.2008-11-11.QIR_4th_Quarter.pdf 46K
Report.HW.152040.2009-01-28.LF_Gas-Monitoring_November-2008.pdf315K
Report.HW.152040.2009-01-28.LF_Gas_Monitor_August_2008.pdf320K
Report.HW.152040.2009-01-28.LF_Gas_Monitor_October_2008.pdf350K
Report.HW.152040.2009-01-28.LF_Gas_Monitor_September_2008.pdf630K
Report.HW.152040.2009-03-25.First_Quarter_QIR.pdf171K
Report.HW.152040.2009-03-25.LF_Gas_Monitor_December_2008.pdf314K
Report.HW.152040.2009-03-25.LF_Gas_Monitor_February_2009.pdf306K
Report.HW.152040.2009-03-25.LF_Gas_Monitor_January_2009.pdf319K
Report.HW.152040.2009-05-01.LF Gas and Control System Monitoring_ocrd.pdf1.4M
Report.HW.152040.2009-06-04.LF_Gas_Monitor_April_2009.pdf312K
Report.HW.152040.2009-06-04.LF_Gas_Monitor_March_2009.pdf316K
Report.HW.152040.2009-08-06.GW_SW_Monitoring.pdf3.3M
Report.HW.152040.2009-09-01.GW_SW_Monitoring.pdf3.5M
Report.HW.152040.2009-11-23.LF_Gas_Monitor_August_2009.pdf325K
Report.HW.152040.2009-12-01.LF_Gas_Monitor_October_2009.pdf346K
Report.HW.152040.2010-01-05.LF_Gas_Monitor_December_2009.pdf318K
Report.HW.152040.2010-01-05.LF_Gas_Monitor_November_2009.pdf362K
Report.HW.152040.2010-03-26.LF_Gas_Monitor_February_2010.pdf371K
Report.HW.152040.2010-03-26.LF_Gas_Monitor_January_2010.pdf356K
Report.HW.152040.2010-04-29.LF_Gas_Monitir_March_2010.pdf325K
Report.HW.152040.2010-06-30.LF_Gas_Monitir_April_2010.pdf394K
Report.HW.152040.2010-07-01.Landfill Gas and Control System Monitoring_OCRD.pdf3.1M
Report.HW.152040.2010-07-01.LF_Gas_Monitor_May_2010.pdf370K
Report.HW.152040.2010-07-31.LF_Gas_Monitor_June_2010.pdf386K
Report.HW.152040.2010-08-01.LFG_Report.pdf3.9M
Report.HW.152040.2010-09-01.Landfill Gas and Control System Monitoring_OCRD.pdf3.3M
Report.HW.152040.2010-09-01.LFG.pdf4.8M
Report.HW.152040.2010-09-14.Groundwater and Surface Water Sampling and Analysis_ocrd.pdf 37M
Report.HW.152040.2010-09-14.GW_SW.pdf 52M
Report.HW.152040.2010-09-14.GW_SW_01.pdf 12M
Report.HW.152040.2010-09-14.GW_SW_02.pdf 13M
Report.HW.152040.2010-09-14.GW_SW_03.pdf 15M
Report.HW.152040.2010-09-14.SW_and_GW_data_June.pdf3.2M
Report.HW.152040.2010-09-20.LFG_August.pdf4.3M
Report.HW.152040.2010-09-20.LFG_July.pdf4.6M
Report.HW.152040.2010-10-01.Landfill Gas and Control System Monitoring_OCRD.pdf4.8M
Report.HW.152040.2010-10-01.LFG.pdf6.9M
Report.HW.152040.2010-11-01.LFG.pdf4.9M
Report.HW.152040.2010-11-24.Landfill Gas Monitoring Well Data_OCRD.pdf3.4M
Report.HW.152040.2011-05-16.Data Report.pdf640K
Report.HW.152040.2011-06-01.TOHL Monitoring Report 06-01-2011.pdf1.0M
Report.HW.152040.2011-06-08.LFG_March_April.pdf 75M
Report.HW.152040.2012-01-30.LFG_May-November.pdf141M
Report.HW.152040.2012-03-15.Environmental Monitoring Report_ocrd.pdf7.4M
Report.HW.152040.2012-03-15.February_LFG.pdf5.0M
Report.HW.152040.2012-03-15.January_LFG.pdf4.9M
Report.HW.152040.2012-04-05.LFG.pdf5.1M
Report.HW.152040.2012-04-05.LFG_pt1.pdf529K
Report.HW.152040.2012-04-05.LFG_pt3.pdf4.2M
Report.HW.152040.2012-05-08.LFG_April.pdf 13M
Report.HW.152040.2012-07-15.GW_SW.pdf172M
Report.HW.152040.2012-07-15.LFG_June.pdf 13M
Report.HW.152040.2012-09-20.August_LFG.pdf 14M
Report.HW.152040.2012-09-20.July_LFG.pdf 13M
Report.HW.152040.2012-09-28.September_LFG.pdf 12M
Report.HW.152040.2012-10-18.GW_SW.pdf174M
Report.HW.152040.2012-12-11.LFG_November.pdf 13M
Report.HW.152040.2013-01-11.LFG_December.pdf 20M
Report.HW.152040.2013-02-15.LFG January.pdf 15M
Report.HW.152040.2013-03-06.February_LFG.pdf 14M
Report.HW.152040.2013-03-28.LFG_March.pdf 15M
Report.HW.152040.2013-05-13.LFG_April.pdf 15M
Report.HW.152040.2013-05-31.GW_SW.pdf143M
Report.HW.152040.2013-06-17.May_LFG.pdf 15M
Report.HW.152040.2013-08-12.LFG_July.pdf 16M
Report.HW.152040.2013-09-11.LFG_August.pdf 15M
Report.HW.152040.2013-10-23.LFG_Sept.pdf 15M
Report.HW.152040.2013-11-14.October_LFG.pdf 15M
Report.HW.152040.2013-11-18.GW and Surface Water Sampling and Analysis.pdf143M
Report.HW.152040.2013-12-03.Environmental Monitoring Report.pdf5.4M
Report.HW.152040.2014-01-27.LFG.pdf4.1M
Report.HW.152040.2014-02-21.LFG.pdf4.4M
Report.HW.152040.2014-03-10.LFG.pdf4.2M
Report.HW.152040.2014-04-04.LGF.pdf141K
Report.HW.152040.2014-05-30.Groundwater and Surface Water Sampling 1 of 5 May 30 2014.pdf 14M
Report.HW.152040.2014-05-30.Groundwater and Surface Water Sampling 2 of 5 May 30 2014.pdf294K
Report.HW.152040.2014-05-30.Groundwater and Surface Water Sampling 3 of 5 May 30 2014.pdf2.8M
Report.HW.152040.2014-05-30.Groundwater and Surface Water Sampling 4of 5 May 30 2014.pdf2.6M
Report.HW.152040.2014-05-30.Groundwater and Surface Water Sampling 5 of 5 May 30 2014.pdf2.2M
Report.HW.152040.2014-06-10.LFG Monitoring Report.pdf2.0M
Report.HW.152040.2014-07-15.LFG Monitoring Report.pdf1.9M
Report.HW.152040.2014-08-04.LFG Monitoring Report.pdf2.0M
Report.HW.152040.2014-08-22.LFG Monitoring Report.pdf2.1M
Report.HW.152040.2014-09-02.R& C Formation Ltd September 2014.pdf2.3M
Report.HW.152040.2014-10-01.R& C Formation Ltd April 2014.pdf2.1M
Report.HW.152040.2014-10-02.R& C Formation Ltd September 2014.pdf2.3M
Report.HW.152040.2014-10-21.R&C Formation Ltd. September 2014 2of 6.pdf6.3M
Report.HW.152040.2014-10-21.R& C Formation Ltd 1 of 6 September 2014 Report.pdf8.2M
Report.HW.152040.2014-10-21.R& C Formation Ltd 3 of 6 September 2014 Report.pdf3.7M
Report.HW.152040.2014-10-21.R& C Formation Ltd 5 of 6 September 2014 Report.pdf2.9M
Report.HW.152040.2014-10-21.R& C Formation Ltd 6 of 6 September 2014 Report.pdf1.5M
Report.HW.152040.2014-10-21.R&C Formation Ltd September 2014 4 of 6 Report.pdf1.7M
Report.HW.152040.2015-03-25.LFG & CS.pdf4.3M
Report.HW.152040.2015-05-04.Groundwater and Surface Water Sampling 1 of 2.pdf 14M
Report.HW.152040.2015-05-04.Groundwater and Surface Water Sampling 2 of 2.pdf8.3M
Report.HW.152040.2015-06-30.LFG-June.pdf2.0M
Report.HW.152040.2015-09-01.September 2015 Appendix I R&C Formation Ltd 3 0f 3.pdf 15M
Report.HW.152040.2015-09-01.September 2015 Groundwater & Surface Water Report.pdf6.6M
Report.HW.152040.2015-09-01.September Report R&C Formation Ltd. 2 of 3.pdf7.4M
Report.HW.152040.2015-09-16.LFG-September Landfill Gas.pdf1.7M
Report.HW.152040.2016-01-11.LFG December 2015.pdf3.1M
Report.HW.152040.2016-04-06.Monitoring Report_R&C.pdf1.7M
Report.HW.152040.2016-10-17.Environmental Monitoring Report.pdf4.3M
Report.HW.152040.2016-11-02.Groundwater & Surface water .pdf 74M
Report.HW.152040.2017-01-17.LF Gas..pdf5.3M
Report.HW.152040.2017-03-28.Environmental Monitoring Report.pdf5.0M
Report.HW.152040.2017-04-01.Groundwater & Surface Water.pdf 29M
Report.HW.152040.2017-06-01.Federal and NYS Regulation Drinking-water-contaminants_OCRD.pdf308K
Report.HW.152040.2017-06-30.Environmental Monitoring Report.pdf8.6M
Report.HW.152040.2017-10-03.Environmental Monitoring Report.pdf7.5M
Report.HW.152040.2017-10-25.Groundwater & Surface Water.pdf 27M
Report.HW.152040.2017-10-25.Groundwater_&_SurfaceWater_OCRD.pdf 60M
Report.HW.152040.2018-01-12.LFG Monitoring .pdf4.1M
Report.HW.152040.2018-01-17.subpart_5-1_tables_OCRD.pdf917K
Report.HW.152040.2018-04-06.Environmental Monitoring Report.pdf2.3M
Report.HW.152040.2018-06-01.GW & SW Sampling and Analysis Report.pdf6.5M
Report.HW.152040.2018-06-01.Landfill Gas and Control System Monitoring Report.pdf3.4M
Report.HW.152040.2019-01-16.GW & SW Report November 2018.pdf5.7M
Report.HW.152040.2019-01-18.Gas & Control System Monitoring .pdf2.1M
Report.HW.152040.2019-03-01.LF Gas and Control System Monitoring_ocrd.pdf1.5M
Report.HW.152040.2019-04-01.GW SWW Sampling and Analysis_ocrd.pdf 44M
Report.HW.152040.2019-06-01.Landfill Gas and Control System Monitoring_ocrd.pdf1.5M
Report.HW.152040.2019-07-25.Gas & Control System Monitoring June 2019.pdf1.3M
Report.HW.152040.2019-10-23.Environmental Monitoring Report_ocrd.pdf1.6M
Report.HW.152040.2019-12-01.Landfill Gas and Control System Monitoring .pdf3.7M
Report.HW.152040.2019-12-10.GW_SW Report 2019.pdf7.8M
Report.HW.152040.2020-04-09.Landfill Gas and Control System Monitoring Report.pdf3.4M
Report.HW.152040.2020-05-21.GW & SW Monitoring Report 1st Half 2020.pdf 11M
Report.HW.152040.2020-06-01.Landfill Gas and Control System Monitoring Report.pdf3.5M
Report.HW.152040.2020-09-30.Landfill Gas Monitoring Report.pdf3.5M
Report.HW.152040.2020-10-31.SW and GW Monitoring Report.pdf4.6M
Report.HW.152040.2020-12-31.Landfill Gas Monitoring Report.pdf4.0M
Report.HW.152040.2021-01-01.Gas Monitoring Report- Jan 2021.pdf3.5M
Report.HW.152040.2021-09-24.Gas Monitoring Report- 2nd Quarter 2021.pdf6.2M
Report.HW.152040.2021-11-23.GW & SW Monitoring Report 1st Half 2021.pdf 13M
Report.HW.152040.2021-12-21.Gas Monitoring Report- 3rd Quarter 2021.pdf6.3M
Report.HW.152040.2022-09-12.Landfill Gas Monitoring Report 2nd Quarter 2022.pdf6.3M
Report.HW.152040.2022-09-19.Landfill Gas Monitoring Report- 4th Quater 2021.pdf6.4M
Report.HW.152040.2022-09-19.Landfill Gas Monitorng Report 1st Quarter 2022.pdf6.3M
Report.HW.152040.2022-09-20.GW & SW Monitoring Report 2nd Half 2021.pdf 15M
Report.HW.152040.2022-11-01.GW & SW Monitoring Report First Half 2022.pdf 15M
Report.HW.152040.2022-11-09.3rd Quarter 2022 Gas Monitoring- email.pdf6.4M
Report.HW.152040.2022-12-01.Landfill Gas Report- 4th Quarter 2022.pdf6.5M
Report.HW.152040.2023-02-01.2nd Half 2022 GW_SW Report.pdf 12M
Report.HW.152040.2023-04-01.Landfill Gas Report- 1st Quarter 2023.pdf6.4M
Report.HW.152040.2023-10-25.Gas Monitoring Report- 2nd Quarter 2023.pdf6.5M
Report.HW.152040.2024-02-27.Gas Monitoring Report- 3rd Quarter 2023.pdf6.8M
Report.HW.152040.2024-02-27.Gas Monitoring Report- 4th Quarter 2023.pdf6.9M
Report.HW.152040.2024-02-27.GW_SW Report- 1st Half 2022.pdf 15M
Report.HW.152040.2024-02-27.GW_SW Report- 1st Half 2023.pdf 15M
Report.HW.152040.2024-05-01.2nd Half 2023 GW_SW Report.pdf 25M
Report.HW.152040.2024-09-01.1st Half 2024 GW_SW Report.pdf 19M
ROD.HW.152040.1996-03-01.Record of Decisions.pdf1.2M
Work Plan.HW.152040.1996-01-01.VI_Summary and Work Plan-1 .pdf760K
Work Plan.HW.152040.1996-08-01.VI_Summary & Work Plan-2.pdf9.0M
Work Plan.HW.152040.2006-01-30.SVIE.pdf2.1M