File listing

Files for this location:

NameSize
Report.HW.152106.1990-06-22.RI Report Project Review.pdf6.7M
Report.HW.152106.1992-07-01.FeasibilityStudyReport_Volume_2.pdf 23M
Report.HW.152106.1992-07-01.Feasibility_Study_Report_Volume_1.pdf6.2M
Report.HW.152106.1992-07-01.Remedial InvestigationReport_Volume_1.pdf6.2M
Report.HW.152106.1992-07-01.Remedial InvestigationReport_Volume_3.pdf4.4M
Report.HW.152106.1992-07-01.Remedial InvestigationReport_Volume_4.pdf5.3M
Report.HW.152106.1992-07-01.Remedial InvestigationReport_Volume_9.pdf5.2M
Report.HW.152106.1992-07-01.Remedial_Investigation_Report_Volume_2.pdf 12M
Report.HW.152106.1993-07-01.SamplingAndAnalysisPlan GW.pdf688K
Report.HW.152106.1993-07-01.SamplingAndAnalysisPlan Soils.pdf688K
Report.HW.152106.1997-05-13.Progress_Report.pdf570K
Report.HW.152106.1997-09-01.Soil_Remedial_Design_Volume_1_of_2.pdf 11M
Report.HW.152106.1997-09-01.Soil_Remedial_Design_Volume_2_of_2.pdf 12M
Report.HW.152106.1998-01-13.Progress_Report_December_1997.pdf2.7M
Report.HW.152106.1998-08-10.ProgressReportJuly1998.pdf2.9M
Report.HW.152106.1999-02-01.Soil_RA_SVE_O&M_Plan.pdf5.2M
Report.HW.152106.1999-03-17.Soil_Remedial_Action_SVE_OandM.pdf1.1M
Report.HW.152106.1999-07-01.1999_First_Quarter_Report_on_SVE_System.pdf8.0M
Report.HW.152106.1999-12-08.Focused_Pump_and_Treat_Operation_Summary_November.pdf1.3M
Report.HW.152106.2001-01-17.Focused_Pump_And_Treat_Operations_Summary.pdf2.7M
Report.HW.152106.2002-03-06.Focused_GW_Remediation_System_Operation_Summary_06-19-2001_to_12-31-2001.pdf3.4M
Report.HW.152106.2002-06-01.ResultsClosureSamplingFormerDrumStorageArea.pdf 17M
Report.HW.152106.2002-09-10.Focused_GW_Remediation_System_Operation_Summary.pdf4.4M
Report.HW.152106.2003-01-30.December_2002_Status_Report_GW_Remedial_Action.pdf3.0M
Report.HW.152106.2003-03-14.January_2003_Status_Report_GW_Remedial_Action.pdf4.1M
Report.HW.152106.2003-03-24.Focussed GW RemediationSystem.pdf2.6M
Report.HW.152106.2003-03-27.SVE_System10.31.2001-12.31.2002.pdf2.2M
Report.HW.152106.2003-04-01.February_2003_Status_Report_GW_Remedial_Action.pdf3.9M
Report.HW.152106.2003-05-08.March_2003_Status_Report_GW_Remedial_Action.pdf4.4M
Report.HW.152106.2003-06-04.January_2003toMarch_2003-Status_Report.pdf291K
Report.HW.152106.2003-06-05.April_2003_Status_Report_GW_Remedial _Action.pdf5.3M
Report.HW.152106.2003-07-15.May_2003_Status_Report_GW_Remedial_Action.pdf5.6M
Report.HW.152106.2003-07-31.June_2003_Status_Report_GW_Remedial_Action.pdf3.3M
Report.HW.152106.2003-09-03.April28_2003toJuly10_2003_Status_Report.pdf1.3M
Report.HW.152106.2003-09-12.April_2003toJuly_2003_Status_Report.pdf326K
Report.HW.152106.2003-09-12.July2003_StatusReport.pdf3.5M
Report.HW.152106.2003-09-19.January_2003toApril_2003_Status_Report.pdf1.0M
Report.HW.152106.2003-11-06.August_2003_Status_Report_GW_Remedial_Action.pdf6.5M
Report.HW.152106.2003-11-25.September_2003_Status_Report_GW_Remedial_Action.pdf6.2M
Report.HW.152106.2003-12-02.July_2003_thru_September_2003_Status_Report_Focussed_Pump_and_Treat.pdf1.7M
Report.HW.152106.2004-01-01.01-09.October_2003_Status_Report_GW_Remedial_Action.pdf7.4M
Report.HW.152106.2004-02-06.November_2003_Status_Report_GW_Remedial_Action.pdf7.3M
Report.HW.152106.2004-02-06.SVE_Status_Report.pdf2.4M
Report.HW.152106.2004-02-09.December_2003_Status_Report_GW_Remedial_Action.pdf5.5M
Report.HW.152106.2004-02-09.September_2003_thru_December_2003_Status_Report_GW_Remedial_Action.pdf5.4M
Report.HW.152106.2004-03-19.2003_Annual_Summary_Report_for_Rowe_Industries_Superfund.pdf 11M
Report.HW.152106.2004-03-23.February_2004_Status_Report_GW_Remedial_Action.pdf2.4M
Report.HW.152106.2004-03-23.January2004_StatusReport.pdf2.2M
Report.HW.152106.2004-04-26.March2004_StatusReport.pdf2.6M
Report.HW.152106.2004-05-01.2004Addendum_to_Soil_Remedial_Action_Report_Former_Drum_Storage_Area.pdf 47M
Report.HW.152106.2004-06-07.April_2004_Status_Report_GW_Remedial_Action.pdf2.6M
Report.HW.152106.2004-07-13.May2004_Status_Report.pdf2.4M
Report.HW.152106.2004-07-29.June2004_Status_Report.pdf4.4M
Report.HW.152106.2004-08-31.July_2004_Status_Report_GW_Remedial_Action.pdf4.5M
Report.HW.152106.2004-09-27.August2004_Status_Report.pdf1.5M
Report.HW.152106.2004-10-01.FocusedFeasibilityStudyGWRemediationFormerDrumStorageArea.pdf164K
Report.HW.152106.2004-12-20.October2004_Status_Report.pdf2.1M
Report.HW.152106.2005-01-31.November2004_Status_Report.pdf3.2M
Report.HW.152106.2005-02-15.December2004_Status_Report.pdf3.7M
Report.HW.152106.2005-03-14.January2005_Status_Report.pdf4.2M
Report.HW.152106.2005-03-23.February2005_Status_Report.pdf3.2M
Report.HW.152106.2005-05-20.March2005_Status_Report.pdf3.6M
Report.HW.152106.2005-05-31.2004_Annual_Summary_Report_for_Rowe_Industries_Superfund.pdf 15M
Report.HW.152106.2005-06-06.April2005.StatusReport.pdf4.6M
Report.HW.152106.2005-07-15.May2005_Status_Report.pdf2.5M
Report.HW.152106.2005-08-12.June2005_Status_Report.pdf3.1M
Report.HW.152106.2005-09-13.July2005_Status_Report.pdf4.7M
Report.HW.152106.2005-10-19.September2004_Status_Report.pdf4.2M
Report.HW.152106.2005-10-20.August2005_Status_Report.pdf3.0M
Report.HW.152106.2005-10-21.EHCMonitoringReport_March2005-September2005.pdf5.6M
Report.HW.152106.2005-11-14.September2005StatusReport.pdf2.7M
Report.HW.152106.2005-12-14.October2005_Status-Report.pdf2.0M
Report.HW.152106.2006-02-17.December2005_Status-Report.pdf2.9M
Report.HW.152106.2006-02-17.November2005_Status-Report.pdf2.4M
Report.HW.152106.2006-04-12.February2006_Status-Report.pdf3.1M
Report.HW.152106.2006-04-12.January2006_Status-Report.pdf2.7M
Report.HW.152106.2006-05-01.2005 Annual Report for Rowe Industries Superfund Site_Draft.pdf 14M
Report.HW.152106.2006-06-21.May2006_Status-Report.pdf5.6M
Report.HW.152106.2006-08-23.FPT_May_June2006_Status-Report.pdf4.5M
Report.HW.152106.2006-08-28.June2006_Status-Report.pdf4.6M
Report.HW.152106.2006-11-08.August2006_Status-Report.pdf4.7M
Report.HW.152106.2006-11-08.July.August.September2006_Status-Report.pdf9.1M
Report.HW.152106.2006-11-15.September2006_Status-Report.pdf4.6M
Report.HW.152106.2006-12-15.October2006_Status-Report.pdf4.5M
Report.HW.152106.2007-02-09.December_2006.Status_Report.pdf4.7M
Report.HW.152106.2007-03-13.January_2007.Status_Report.pdf5.0M
Report.HW.152106.2007-05-02.May2007_Status_Report.pdf5.9M
Report.HW.152106.2007-05-29.Status Report March 07.pdf4.4M
Report.HW.152106.2007-06-26.Status Report April 2007.pdf5.0M
Report.HW.152106.2007-07-24.Status Report May Status Memo.pdf5.0M
Report.HW.152106.2007-08-13.June 2007 Monthly Status Report .pdf6.4M
Report.HW.152106.2007-09-27.Status Report July 2007.pdf4.9M
Report.HW.152106.2007-11-16.Status ReportFocusedPTS3rd qtr 2007.pdf2.4M
Report.HW.152106.2007-11-16.Status Report Sept 2007.pdf4.1M
Report.HW.152106.2008-01-11.November2007StatusReport.pdf4.2M
Report.HW.152106.2008-01-25.December2007StatusReport.pdf9.2M
Report.HW.152106.2008-02-22.EPA_5_Year_Review.pdf111K
Report.HW.152106.2008-03-05.January2008StatusReport.pdf4.8M
Report.HW.152106.2008-04-07.February2008StatusReport.pdf3.9M
Report.HW.152106.2008-04-22.Status ReportFocusedPTS4th qtr 2007.pdf1.6M
Report.HW.152106.2008-06-05.April2008StatusReport.pdf4.8M
Report.HW.152106.2008-07-18.May2008StatusReport.pdf4.4M
Report.HW.152106.2008-08-04.June2008StatusReport.pdf6.7M
Report.HW.152106.2008-08-19.Status ReportFocusedPTS2nd qtr 2008.pdf2.5M
Report.HW.152106.2008-08-20.2007_Annual_Summary_Report_for_Rowe_Industries_Superfund.pdf 97M
Report.HW.152106.2008-09-05.July2008StatusReport.pdf7.6M
Report.HW.152106.2008-10-10.August2008StatusReport.pdf7.1M
Report.HW.152106.2008-11-18.September2008StatusReport.pdf9.3M
Report.HW.152106.2009-01-06.November2008StatusReport.pdf7.7M
Report.HW.152106.2009-01-12.October2008StatusReport.pdf7.1M
Report.HW.152106.2009-03-06.January2009StatusReport.pdf8.8M
Report.HW.152106.2009-05-20.February2009StatusReport.pdf1.6M
Report.HW.152106.2009-06-11.April2009StatusReport.pdf7.9M
Report.HW.152106.2009-06-11.March2009StatusReport.pdf8.4M
Report.HW.152106.2009-07-23.May2009StatusReport.pdf5.4M
Report.HW.152106.2009-08-03.2008_Annual_Summary_Report_for_Rowe_Industries_Superfund.pdf 47M
Report.HW.152106.2009-08-10.June2009StatusReport.pdf8.5M
Report.HW.152106.2009-09-04.July2009StatusReport.pdf7.7M
Report.HW.152106.2009-11-11.StatusReport0909Sept.pdf8.2M
Report.HW.152106.2009-12-09.Status1009Oct.pdf7.3M
Report.HW.152106.2010-01-06.Status1109Nov.pdf7.0M
Report.HW.152106.2010-03-03.Status0110Jan.pdf 12M
Report.HW.152106.2010-03-19.Status1209Dec.pdf 10M
Report.HW.152106.2010-04-02.Status0210Feb.pdf 13M
Report.HW.152106.2010-05-24.Status0310Mar.pdf9.8M
Report.HW.152106.2010-06-23.Status0410Apr.pdf 14M
Report.HW.152106.2010-07-01.2009_Annual_Summary_Report_for_Rowe_Industries_Superfund.pdf 33M
Report.HW.152106.2010-10-15.Status0710 July.pdf 15M
Report.HW.152106.2010-10-21.Status0810Aug.pdf 11M
Report.HW.152106.2010-11-02.Status0910 Sept.pdf2.0M
Report.HW.152106.2010-12-20.Status1010 Oct.pdf 15M
Report.HW.152106.2010-12-21.Status 1110 Nov.pdf 13M
Report.HW.152106.2011-04-11.Status0111Jan full rpt.pdf 18M
Report.HW.152106.2011-05-04.Status0311Mar.pdf124K
Report.HW.152106.2011-09-11.2010_Annual_Summary_Report_for_Rowe_Industries_Superfund.pdf133M
Report.HW.152106.2011-09-11.2010_Annual_Summary_Report_for_Rowe_Industries_SuperfundApp B.pdf 39M
Report.HW.152106.2012-01-27.Status1211Dec.pdf3.7M
Report.HW.152106.2012-02-08.Reclass_Package_2_to_4_-_FINAL.pdf795K
Report.HW.152106.2012-03-26.Status0112Jan.pdf4.3M
Report.HW.152106.2012-04-20.Status0212Feb_with app.pdf3.7M
Report.HW.152106.2012-06-11.Status0312MarWithApp.pdf4.6M
Report.HW.152106.2012-06-28.Status Rpt Apr 2012-full.pdf3.6M
Report.HW.152106.2012-07-01.2011_Annual_Summary_Report_for_Rowe_Industries_Superfund.pdf 29M
Report.HW.152106.2012-10-10.Status0712July.pdf.pdf4.2M
Report.HW.152106.2012-11-06.Status0812Aug app.pdf4.9M
Report.HW.152106.2012-11-19.Status Rpt Sept including Apps.pdf5.1M
Report.HW.152106.2012-12-18.Status Rpt Oct including Apps.pdf5.8M
Report.HW.152106.2013-01-19.Status1112Nov.pdf6.0M
Report.HW.152106.2013-02-21.Status0113Jan.pdf5.0M
Report.HW.152106.2013-02-22.Status1212Dec2.pdf5.9M
Report.HW.152106.2013-05-20.Status Rpt Mar 13.pdf4.6M
Report.HW.152106.2013-06-26.Status Rpt Apr 2013.pdf7.0M
Report.HW.152106.2013-06-27.Status Rpt May 2013.pdf6.9M
Report.HW.152106.2013-07-26.Status Rpt June 2013.pdf7.2M
Report.HW.152106.2013-10-03.Status Rpt July Full.pdf8.0M
Report.HW.152106.2013-11-11.Status0813Aug.pdf3.9M
Report.HW.152106.2013-11-13.Status0913Sept_apps.pdf4.8M
Report.HW.152106.2013-12-16.Status1013Oct.pdf7.1M
Report.HW.152106.2014-01-10.Status1213Dec.pdf6.0M
Report.HW.152106.2014-04-29.report.hw152106.2014-04-29.Status0114Jan.pdf6.1M
Report.HW.152106.2014-05-21.report.hw152106.2014-05-21.Status0214Feb.pdf5.9M
Report.HW.152106.2014-05-27.report.hw152106.2014-05-27.Status0314Mar.pdf3.5M
Report.HW.152106.2017-10-02.FDSA Investigation Report - Kraft Foods.pdf 37M
Report.HW.152106.2018-01-04.Monthly Status 2017 August.pdf1.8M
Report.HW.152106.2018-01-04.Monthly Status Oct2017.pdf1.9M
Report.HW.152106.2018-01-04.Monthly Status Sept2017.pdf1.7M
Report.HW.152106.2018-01-23.Monthly Status Oct20171.pdf1.9M
Report.HW.152106.2018-03-05.Sept 2017 Semi-Annual GW Quality.pdf6.5M
Report.HW.152106.2018-03-05.Status Rpt Nov 2017.pdf1.7M
Report.HW.152106.2018-03-06.December 2017 Status Report.pdf1.7M
Report.HW.152106.2018-04-17.Rowe 5YR 2018 Figures 1 to 3.pdf4.3M
Report.HW.152106.2018-04-17.Rowe 5YR 2018 Graphs 1 to 4.pdf1.8M
Report.HW.152106.2018-04-17.Rowe 5YR 2018 Tables 4 to 7.pdf 11M
Report.HW.152106.2018-06-26.Third 5-yr review.pdf 17M
Report.HW.152106.2018-10-22.Status Report Apr2018 - Kraft.pdf2.4M
Report.HW.152106.2018-10-22.Status Report _June 2018 - Kraft.pdf2.2M
Report.HW.152106.2018-10-22.Status Rpt May 2018 - Kraft.pdf1.5M
Report.HW.152106.2018-10-22.Staus Rpt March 2018 - Kraft.pdf2.3M
Report.HW.152106.2018-10-23.2017 Annual Summart Report - Kraft Heinz Foods.pdf2.9M
Report.HW.152106.2018-10-23.March 2018 Semi-Annual report - Kraft Heinz Foods.pdf6.3M
Report.HW.152106.2018-12-07.Status Report, Aug_Sept 2018 - Kraft.pdf3.5M
Report.HW.152106.2018-12-07.Status Report, July 2018 - Kraft.pdf2.4M
Report.HW.152106.2019-02-08.Status Report, October 2018 - Kraft.pdf2.2M
Report.HW.152106.2019-02-25.2018 Supplement Study - Kraft Foods.pdf5.8M
Report.HW.152106.2019-02-25.Sept 2018 Semi-Annual report.pdf6.7M
Report.HW.152106.2019-02-25.Status Rpt, Dec 2018 - Kraft.pdf1.6M
Report.HW.152106.2019-04-08.Status Rpt, Feb 2019 - Kraft Foods.pdf1.6M
Report.HW.152106.2019-04-08.Status Rpt, Jan 2019 - Kraft Foods.pdf2.3M
Report.HW.152106.2019-07-22.Status Report, April 2019 - Kraft Foods.pdf2.4M
Report.HW.152106.2019-07-22.Status Report, March 2019 - Kraft Foods.pdf2.4M
Report.HW.152106.2019-07-22.Status Report, May 2019 - Kraft Foods.pdf1.6M
Report.HW.152106.2019-08-30.REH Report_WP for GW Remediation-Sag Harbor NY_Final.pdf1.9M
Report.HW.152106.2019-10-08.2018 Annual Summary Report - Kraft Foods.pdf1.1M
Report.HW.152106.2019-10-08.Status Report, July 2019 - Kraft Foods.pdf2.3M
Report.HW.152106.2019-10-08.Status Report, June 2019 - Kraft Foods.pdf1.5M
Report.HW.152106.2019-10-15.Status Report, August 2019 - Kraft Foods.pdf1.6M
Report.HW.152106.2019-11-04.REH Report_WP for GW Remediation-Sag Harbor NY_Final_Oct 2019.pdf2.2M
Report.HW.152106.2020-02-24.Mar 2019 Semi-Annual report, Kraft Foods.pdf7.2M
Report.HW.152106.2020-02-24.Status Report, October 2019 - Kraft Foods.pdf2.4M
Report.HW.152106.2020-02-24.Status Report, September 2019 - Kraft Foods.pdf1.5M
Report.HW.152106.2020-02-25.Status Report, December 2019 - Kraft Foods.pdf1.5M
Report.HW.152106.2020-02-25.Status Report, November 2019 - Kraft Foods.pdf1.5M
Report.HW.152106.2020-05-12.Status Report - February 2020, Kraft Foods.pdf1.5M
Report.HW.152106.2020-05-12.Status Report - January 2020, Kraft Foods.pdf2.0M
Report.HW.152106.2020-05-12.Status Report - March 2020, Kraft Foods.pdf1.4M
Report.HW.152106.2020-05-27.REH Report_Electron Donor Injection Documentation_Final.pdf6.1M
Report.HW.152106.2020-08-19.Status Report - April 2020, Kraft Foods.pdf1.5M
Report.HW.152106.2020-08-19.Status Report - June 2020, Kraft Foods.pdf1.5M
Report.HW.152106.2020-08-19.Status Report - May 2020, Kraft Foods.pdf1.3M
Report.HW.152106.2020-08-21.REH Report_Post-RA Quarterly Monitoring Report No1_Final.pdf8.3M
Report.HW.152106.2020-11-09.REH Report_Post-RA Quarterly Monitoring Report No2_Final.pdf 14M
Report.HW.152106.2020-11-30.Status Report - August 2020, Kraft Foods.pdf1.3M
Report.HW.152106.2020-11-30.Status Report - July 2020, Kraft Foods.pdf2.5M
Report.HW.152106.2020-11-30.Status Report - October 2020, Kraft Foods.pdf1.4M
Report.HW.152106.2020-11-30.Status Report - September 2020, Kraft Foods.pdf834K
Report.HW.152106.2021-02-22.REH Report-QMR No. 3_Kraft-Sag Harbor NY.pdf7.4M
Report.HW.152106.2021-05-05.Status Report - December 2020, Kraft Foods.pdf818K
Report.HW.152106.2021-05-05.Status Report - February 2021, Kraft Foods.pdf868K
Report.HW.152106.2021-05-05.Status Report - January 2021, Kraft Foods.pdf1.4M
Report.HW.152106.2021-05-05.Status Report - March 2021, Kraft Foods.pdf819K
Report.HW.152106.2021-05-05.Status Report - November 2020, Kraft Foods.pdf839K
Report.HW.152106.2021-06-04.REH Report-QMR No. 4_Kraft-Sag Harbor NY.pdf8.0M
Report.HW.152106.2021-06-04.Status Report - April 2021, Kraft Foods.pdf1.8M
Report.HW.152106.2021-11-29.REH Report-GWMR No. 5_Kraft-Sag Harbor NY_Final.pdf8.3M
Report.HW.152106.2022-05-02.REH Report-GWMR No 6_Kraft-Sag Harbor NY_Final.pdf7.3M
ROD.HW.152106.1992-09-01.rowe.pdf1.2M