Index of /data/DecDocs/C915353

Icon  Name                                                                                                         Size  
[   ] Decision Document.BCP.C915353.2024-07-12.JJones_Tonawanda Coke Site C915353 Memorandum.pdf 46K [   ] Work Plan.BCP.C915353.2020-10-20.Responsiveness Summary-RIWP Comments.pdf 61K [   ] Fact Sheet.BCP.C915353.2020-08-27.DEC Announces Tonawanda Community Working Group.pdf 78K [   ] Fact Sheet.BCP.C915353.2019-12-04.BCP Application-Public Notice.pdf 84K [   ] Fact Sheet.BCP.C915353.2020-07-23.RIWP Public Comment Period Extended.pdf 84K [   ] Decision Document.BCP.C915353.2024-08-28.DecisionDocument_Public Comment-Response.pdf 151K [   ] Decision Document.BCP.C915353.2024-07-15.BRauch_Tonawanda Coke Site C915353 Letter.pdf 162K [   ] Decision Document.BCP.C915353.2024-07-19.SSmith_Tonawanda Coke Site C915353 Letter.pdf 264K [   ] Work Plan.BCP.C915353.2023-12-08.Solidification IRM_Addendum#1.pdf 321K [   ] Fact Sheet.BCP.C915353.2020-07-01.Newsletter01_RIWP Public Comment Period.pdf 434K [   ] Report.BCP.C915353.1992-11-20.Draft Additional Site Investigation Maps.pdf 467K [   ] Application.BCP.C915353.2020-02-14.Responsiveness Summary to BCP Application Public Comments.pdf 577K [   ] Fact Sheet.BCP.C915353.2023-08-23.2023-08-23.Draft RIR Available.pdf 636K [   ] Fact Sheet.BCP.C915353.2020-09-23.Newsletter02_TCC RI Start.pdf 640K [   ] Agreement.BCP.C915353.2020-02-14.Executed BCA.pdf 737K [   ] Fact Sheet.BCP.C915353.2024-06-05.AlternativesAnalysis_CleanupProposed.pdf 738K [   ] Work Plan.BCP.C915353.2020-04-08.Citizen Participation Plan_FINAL.pdf 814K [   ] Work Plan.BCP.C915353.2024-01-18.Solidification IRM_Addendum#4.pdf 865K [   ] Work Plan.BCP.C915353.2023-08-30.BreezeAdsorptionBenchTest_Final.pdf 1.0M [   ] Decision Document.BCP.C915353.2024-07-18.Assem-WConrad_Tonawanda Coke Site C915353 Letter.pdf 1.0M [   ] Work Plan.BCP.C915353.2022-05-27.Cyanide Leaching Sample Locations.pdf 1.0M [   ] Fact Sheet.BCP.C915353.2020-10-26.Newsletter03_BCP and TCC RI Start.pdf 1.3M [   ] Work Plan.BCP.C915353.2024-02-23.Solidification IRM_Addendum#5.pdf 1.4M [   ] Work Plan.BCP.C915353.2023-04-11.PreDesignInvestigation_AdditionalTestPits.pdf 2.1M [   ] Fact Sheet.BCP.C915353.2021-05-26.Newsletter04_Stack Demolition.pdf 2.3M [   ] Work Plan.BCP.C915353.2020-11-17.South Ditch Road Improvement IRM Work Plan_Final.pdf 2.7M [   ] Work Plan.BCP.C915353.2020-03-19.Light Oil Area Sampling Work Plan_Final.pdf 3.0M [   ] Decision Document.BCP.C915353.2024-08-28.DecisionDocument_Final.pdf 3.3M [   ] Report.BCP.C915353.2021-10-18.Fire Residual Investigation_Data Summary_Final.pdf 3.4M [   ] Work Plan.BCP.C915353.2020-08-05.Drum and Container Management Work Plan.pdf 3.4M [   ] Work Plan.BCP.C915353.2021-06-15.Supplemental RI Scope Summary_Final.pdf 3.6M [   ] Work Plan.BCP.C915353.2024-04-15.Radiological Work Plan for the RITC Site_Final.pdf 3.6M [   ] Work Plan.BCP.C915353.2024-07-29.Demolition Work Plan-Buildings 68_Final.pdf 3.7M [   ] Work Plan.BCP.C915353.2021-02-15.Coal Breaker Building ACM Abatement Access_Final.pdf 3.8M [   ] Work Plan.BCP.C915353.2021-08-23.Bench Scale Testing-Coke Oven Gas Residual_Final.pdf 4.1M [   ] Work Plan.BCP.C915353.2021-04-22.SWPPP Surface Water System-Next Steps_Final.pdf 4.2M [   ] Work Plan.BCP.C915353.2021-07-08.Surface Water System Maintenance_Concrete-Lined Settling Pond IRM_Final.pdf 4.6M [   ] Work Plan.BCP.C915353.2020-06-05.Stormwater Sewer IRM Work Plan_Final.pdf 5.1M [   ] Report.BCP.C915353.2023-10-06.BreezeAdsorptionBenchTestResults_Final.pdf 5.1M [   ] Report.BCP.C915353.2020-05-01.Light Oil Area Water Profiling Report_Final.pdf 5.1M [   ] Work Plan.BCP.C915353.2024-01-08.Solidification IRM_Addendum#2.pdf 5.4M [   ] Decision Document.BCP.C915353.2024-07-15.TMorahan_Tonawanda Coke Site C915353 Memorandum.pdf 5.4M [   ] Report.BCP.C915353.2023-07-19.AST-CBS-PBS Tank Removal_Weekly Reports.pdf 6.5M [   ] Report.BCP.C915353.1990-07-02.Supplemental Site Investigation Volume 1.pdf 7.2M [   ] Work Plan.BCP.C915353.2020-12-22.Mixing Pad Closure Work Plan_Final.pdf 7.4M [   ] Work Plan.BCP.C915353.2022-06-07.Above Ground Storage Tank ST24 Investigation Work Plan_Final.pdf 7.6M [   ] Work Plan.BCP.C915353.2020-12-23.Surface Water System Maintenance Phase 3 Work Plan_Final.pdf 8.1M [   ] Work Plan.BCP.C915353.2023-03-28.ST24 Bioremediation IRM_Final.pdf 8.3M [   ] Work Plan.BCP.C915353.2021-05-14.Secondary Containment Closure Work Plan_Final.pdf 8.8M [   ] Report.BCP.C915353.2020-08-30.nygeology_2020_Tonawanda_Coke_ESA.pdf 8.9M [   ] Report.BCP.C915353.2023-08-18.Volume #1 - DRAFT RI REPORT - Text and Tables .pdf 9.2M [   ] Work Plan.BCP.C915353.2024-09-10.Ammonia SCO Work Plan_Final.pdf 9.7M [   ] Work Plan.BCP.C915353.2021-08-20.Fire Residual PFAS Investigation_Final.pdf 9.9M [   ] Work Plan.BCP.C915353.2021-04-21.CBS PBS Tank Closure Work Plan_Final.pdf 10M [   ] Work Plan.BCP.C915353.2023-01-20.Junction Building NAPL Removal-Final.pdf 11M [   ] Work Plan.BCP.C915353.2022-12-20.Preliminary_ST21 to ST23 Investigation-Final.pdf 11M [   ] Report.BCP.C915353.2021-07-15.North Pipeline IRM Construction Completion Report_Final.pdf 13M [   ] Work Plan.BCP.C915353.2023-02-15.PreDesignInvestigation_Work Plan-Final.pdf 14M [   ] Work Plan.BCP.C915353.2024-10-30.RAWP_Full-Scale Water Treatment Area Bioremediation_Final.pdf 14M [   ] Report.BCP.C915353.1992-11-02.Draft Additional Site Investigation.pdf 16M [   ] Report.BCP.C915353.2008-01-18.Supplemental Report and Feasability Study.pdf 16M [   ] Report.BCP.C915353.2024-11-12.WWTArea_PreliminaryInvestigationCCR_Final.pdf 17M [   ] Work Plan.BCP.C915353.2021-10-13.Coke Oven Gas Residual IRM Work Plan_Final.pdf 18M [   ] Work Plan.BCP.C915353.2021-10-13.Lime Still IRM Work Plan_Final.pdf 19M [   ] Application.BCP.C915353.2019-11-14.BCP Application.pdf 19M [   ] Work Plan.BCP.C915353.2020-07-15.Mixing Pad Dewatering IRM Work Plan_Final.pdf 19M [   ] Work Plan.BCP.C915353.2023-10-05.Solidification IRM_Final.pdf 22M [   ] Report.BCP.C915353.1986-12-01.Phase II.pdf 22M [   ] Work Plan.BCP.C915353.2022-07-08.Process Equipment IRM_Final.pdf 23M [   ] Report.BCP.C915353.2024-03-14.IRM Data Submission Files.pdf 27M [   ] Work Plan.BCP.C915353.2020-10-02.Placement of Unrecovered Coal Yard Stockpiles_Final.pdf 28M [   ] Work Plan.BCP.C915353.2020-07-17.Coal and Coke Exvcavation Work Plan_Final.pdf 28M [   ] Report.BCP.C915353.1990-07-02.Supplemental Site Investigation - Volume 2.pdf 31M [   ] Report.BCP.C915353.2023-08-18.Volume #3 - Draft Appendicies A through D.pdf 32M [   ] Work Plan.BCP.C915353.2021-12-20.Groundwater Collection and Treatment_IRM Work Plan_Final.pdf 34M [   ] Work Plan.BCP.C915353.2020-07-31.ISMP_Work Scope 3_Final.pdf 38M [   ] Work Plan.BCP.C915353.2020-08-27.Abandoned Pipeline IRM_Final.pdf 47M [   ] Work Plan.BCP.C915353.2021-03-23.Demolition Work Plan-Buildings and Structures_Final.pdf 53M [   ] Work Plan.BCP.C915353.2020-04-18.Interim Site Management Work Plan_Final.pdf 55M [   ] Report.BCP.C915353.2021-07-20.Mixing Pad Closure-Construction Completion Report_Final.pdf 56M [   ] Work Plan.BCP.C915353.2020-05-29.Stormwater Pollution Prevention Plan_Final.pdf 59M [   ] Report.BCP.C915353.2024-05-20.Alternatives Analysis Report_Final.pdf 79M [   ] Work Plan.BCP.C915353.2021-01-29.AST Managment IRM Work Plan_Final.pdf 79M [   ] Work Plan.BCP.C915353.2020-10-16.Stormwater Sewer IRM_Phase 1 Report, Phase 2 Work Plan_Final.pdf 83M [   ] Work Plan.BCP.C915353.2020-06-05.ISMP_Work Scope 2_Final.pdf 87M [   ] Report.BCP.C915353.2023-08-18.Volume #2 - Draft Figures .pdf 92M [   ] Report.BCP.C915353.2023-08-18.Volume #4 - Draft Appendicies E through I.pdf 102M [   ] Work Plan.BCP.C915353.2020-10-20.Remedial Investigation Work Plan_Final.pdf 396M