NYS Department of Environmental Conservation
File listing
Files for this location:
Name
Size
Agreement.HW.633006.1990-06-04.FFA.pdf
2.1M
Agreement.HW.633006.1990-08-21.Final_IAG.pdf
2.5M
Consent Order.HW.633006.1990-06-14.Griffiss_Federal_Facilities_Agreement.pdf
2.1M
Decision Document.HW.633006.1984-01-01.NPL_LIST_PACKET.pdf
60M
Decision Document.HW.633006.2011-06-01.FOSET_for_F11B_F6B6_F6b7_A2_A4-A5-F10c2_F10C3.pdf
47M
Fact Sheet.HW.633006.2003-07-31.fact_sheet_six_mile_creek.pdf
1.6M
Fact Sheet.HW.633006.2003-07-31.public_meeting-TMC-prap.pdf
1.6M
Fact Sheet.HW.633006.2006-08-01.PP SAR Final7_06_OCRD.pdf
3.5M
Fact Sheet.HW.633006.2007-09-24.public_notice_OBGW_PRAP.pdf
186K
Permit.HW.633006.2003-04-07.1993_TO_1998_BLDG36_HAZ_WASTE.pdf
33M
PRAP.HW.633006.2005-01-01.Small_Arms_Range_PRAP.pdf
657K
PRAP.HW.633006.2005-08-25.methane_gas_remediation_plan_landfill_1.pdf
223K
PRAP.HW.633006.2007-09-01.Proposed_Plan_OBGW.pdf
5.1M
PRAP.HW.633006.2007-09-28.OBGW_PRAP.pdf
5.1M
PRAP.HW.633006.2009-06-30.FPTA_Proposed_Plan.pdf
929K
PRAP.HW.633006.2010-01-29.PRAP_AOC9.pdf
1.5M
PRAP.HW.633006.2010-07-30.Proposed_Plan_Building_133.pdf
831K
PRAP.HW.633006.2011-02-16.Coal_Storage_Yard.OU_38.signed_PRAP.pdf
346K
PRAP.HW.633006.2016-03-31.revised Final PRAP SVI .pdf
1.4M
Published Article.HW.633006.2026-09-16.New Chobani Site Plans Approved by Rome Planning Board.pdf
3.5M
Report.HW.633006.1981-04-14.IRP_Phase_1.pdf
9.5M
Report.HW.633006.1982-12-01.IRP_Phase_2.pdf
12M
Report.HW.633006.1988-01-29.overall_management_plan_irp.pdf
610K
Report.HW.633006.1989-02-01.Containments_in_Fish_and_Sediment_from_Sixmile_Creek.pdf
1.5M
Report.HW.633006.1992-04-01.Final_Primary_Report.pdf
1.7M
Report.HW.633006.1992-08-01.Final_Design_Analysis_Report.pdf
2.9M
Report.HW.633006.1992-08-01.Specifications_for_Interim_Removal_Action_Adesigns.pdf
4.2M
Report.HW.633006.1992-09-01.Revised_Final_Engineers_Evaluation_Cost_Analysis_Report.pdf
378K
Report.HW.633006.1992-12-01.Addendum_to_Final_Primary_Report.pdf
394K
Report.HW.633006.1992-12-01.Soil_Sampling_Along_Jet_Fuel_Transfer_Pipeline.pdf
754K
Report.HW.633006.1993-12-01.Final_Site_Investigation_Report.pdf
4.1M
Report.HW.633006.1994-02-01.Final_Confirmatory_Sampling_at_Industrial_Soils_Pad.pdf
1.9M
Report.HW.633006.1994-06-01.Identification_AOI.pdf
57M
Report.HW.633006.1995-06-30.Phase_1_Archaeological_Investigations.pdf
7.5M
Report.HW.633006.1996-09-09.public_health_assessment.pdf
192K
Report.HW.633006.1997-04-01.Phase_2_Archaeological_Investigations_Volume_1.pdf
4.9M
Report.HW.633006.1997-04-01.Phase_2_Archaeological_Investigations_Volume_2.pdf
4.3M
Report.HW.633006.1998-01-01.Building_100_UST_Removal.pdf
2.9M
Report.HW.633006.1998-07-01.Final_Supplemental_Investigations_Volume_1.pdf
6.6M
Report.HW.633006.1998-07-01.Final_Supplemental_Investigations_Volume_2.pdf
14M
Report.HW.633006.2000-07-17.Preliminary_Phase_1_Results.pdf
647K
Report.HW.633006.2001-01-01.Volume_2_Year_2000_Expanded_Site_Investigation.pdf
26M
Report.HW.633006.2001-07-19.griffiss_FAFB_AOI_lists_tables.pdf
601K
Report.HW.633006.2002-01-01.Volume_1_Year_2000_Expanded_Site_Investigation.pdf
8.4M
Report.HW.633006.2002-02-01.Lead_Based_Paint_Risk_Assessment_Inspection.pdf
10M
Report.HW.633006.2002-03-01.Engineers_Certification_Report.pdf
844K
Report.HW.633006.2002-06-01.Final_Engineering_Evaluation_Cost_Analysis_Report_Small_Arms_Range_Hardfill_49A.pdf
8.1M
Report.HW.633006.2002-07-01.TMCreek_FR_Addendum.pdf
15M
Report.HW.633006.2002-09-01.Parcel F7 Golf Course Area FOST .pdf
1.0M
Report.HW.633006.2002-10-01.Quality_Control_Summary_Report_2002_Addendum.pdf
5.4M
Report.HW.633006.2002-11-01.Quality_Control_Summary_2002.pdf
3.7M
Report.HW.633006.2003-01-01.TMC_fish_advisory-2003_2004.pdf
1.1M
Report.HW.633006.2003-03-01.LTM_shortened_SRA_AR_3_06_AFRPA.pdf
48M
Report.HW.633006.2003-05-01.CertclosureLF7.pdf
278M
Report.HW.633006.2003-05-01.Engineers_Certification_Report.pdf
188M
Report.HW.633006.2003-06-01.Year_2002_Expanded_Site_Investigation.pdf
2.3M
Report.HW.633006.2003-09-01.Interim_Remedial_Action_Report.pdf
1.8M
Report.HW.633006.2003-09-02.EDCTin_City.pdf
9.9M
Report.HW.633006.2003-10-01.Engineering_Evaluation_Cost_Analysis_Report.pdf
1.0M
Report.HW.633006.2003-10-01.Final_IRA_Report.pdf
8.7M
Report.HW.633006.2003-11-24.Final_FOST_Parcel_F3.pdf
59M
Report.HW.633006.2003-12-01.Decision_Document_Closure_Report.pdf
2.3M
Report.HW.633006.2004-01-27.decommission.pdf
3.1M
Report.HW.633006.2004-02-01.Pump_station_Performance_Test_Analytical_Results.pdf
458K
Report.HW.633006.2004-02-01.Rich_Sloping_Fen_Baseline_Assessment.pdf
3.4M
Report.HW.633006.2004-04-01.Final Remedial Investigation Report.pdf
669M
Report.HW.633006.2004-04-01.Final_RI_Report_nosedocks_apron2.pdf
23M
Report.HW.633006.2004-04-01.Parcel A1A Airfield FOST.pdf
3.1M
Report.HW.633006.2004-05-01.AOC9_WSA_Landfill_RI.pdf
80M
Report.HW.633006.2004-05-01.Final_Design_Basis_TMC.pdf
33M
Report.HW.633006.2004-05-01.Final_RI_Report.pdf
17M
Report.HW.633006.2004-05-01.OMM_Plan.pdf
4.9M
Report.HW.633006.2004-06-18.landfill_gas_monitoring_landfill_1_and23.pdf
362K
Report.HW.633006.2004-09-01.FS_AOC9.pdf
3.5M
Report.HW.633006.2004-10-01.3_and_6_Mile_Long_Term_Monitoring_Report.pdf
2.1M
Report.HW.633006.2004-10-13.RLS.pdf
49K
Report.HW.633006.2004-12-13.WAD_Pilot_Study_Landfill_6.pdf
1.4M
Report.HW.633006.2005-02-01.LTReport.pdf
2.0M
Report.HW.633006.2005-06-01.Basewide_five_year_Review.pdf
175M
Report.HW.633006.2005-08-01.Remedial_Action_LF5_and_LF7.pdf
927K
Report.HW.633006.2005-08-22.gas_monitoring_remediation_plan.pdf
2.5M
Report.HW.633006.2005-08-31.LTM_report_Landfills_1_23_4_5_7.pdf
145M
Report.HW.633006.2005-08-31.OBGW_monitoring_report.pdf
208M
Report.HW.633006.2005-10-31.building_104_sewer lines_PSA.pdf
20M
Report.HW.633006.2005-11-01.Long_Term_Monitoring_Report.pdf
49M
Report.HW.633006.2005-11-30.Petroleum_source_removal_AOCs_LTM.pdf
56M
Report.HW.633006.2006-01-01.LTM_Petroleum_Source_Removal_AOC.pdf
14M
Report.HW.633006.2006-01-01.OBGW_AOCs_GW_Monitoring.pdf
11M
Report.HW.633006.2006-02-10.Landfill 2_3 Oand M_addendum.pdf
3.6M
Report.HW.633006.2006-04-01.April_2006_Monitoring_Report.pdf
207M
Report.HW.633006.2006-04-07.LTM_Report.pdf
19K
Report.HW.633006.2006-05-01.Annual_LTM_Report_Six_Mile_Creek.pdf
176M
Report.HW.633006.2006-05-01.Fall_2005_Annual_LTM_Report_for_SMC.pdf
176M
Report.HW.633006.2006-05-01.Phase_1_and_Phase_2_Parcel_F1_Plumley.pdf
142M
Report.HW.633006.2006-06-01.Long Term Monitoring Report.pdf
487M
Report.HW.633006.2006-07-01.Feasibility_Stdudy_Apron2_ChlorinatedPlume.pdf
26M
Report.HW.633006.2006-07-01.Feasibility_Study_Nosedocks_Apron2_ChlorinatedPlume.pdf
26M
Report.HW.633006.2006-07-31.LTM_petroleum_source_removal_AOC.pdf
64M
Report.HW.633006.2006-08-22.August_2006_Monitoring_Report.pdf
210M
Report.HW.633006.2006-08-31.Construction_Completion_Report.pdf
153M
Report.HW.633006.2006-10-31.AFRL_PSA_and_SI.pdf
20M
Report.HW.633006.2006-11-30.petroleum_AOCs_LTM.pdf
56M
Report.HW.633006.2007-02-01.PreDesign_Investigation_LF6_817_775_AOC9.pdf
57M
Report.HW.633006.2007-04-01.Remediation_Report_Petroleum_Spills_Sites.pdf
72M
Report.HW.633006.2007-06-01.LTM Report Landfill A.pdf
652M
Report.HW.633006.2007-08-01.August_2007_Long_Term_Monitoring_Report.pdf
14M
Report.HW.633006.2007-08-01.Monitoring_Report_OBGW_Baseline.pdf
118M
Report.HW.633006.2007-08-01.Spring_2007_Monitoring_OBGW.pdf
8.4M
Report.HW.633006.2007-08-31.OBGW_monitoring_report_spring_2007.pdf
9.9M
Report.HW.633006.2007-09-01.Implementation_RA_Landfill_2_3.pdf
316K
Report.HW.633006.2007-10-01.Fall_2006_Annual_LTM_Six_Mile_Creek.pdf
192M
Report.HW.633006.2007-10-01.SVI_Data_Summary_Apron2_Building_817_WSA_775_and_AOC0.pdf
19M
Report.HW.633006.2007-10-01.Three_Mile_Creek_Fall_2006_Annual_LTM.pdf
288M
Report.HW.633006.2007-10-31.Fall_2006_Annual_LTM.pdf
192M
Report.HW.633006.2007-10-31.SVI_survey_data_summary_Apron2_bldg817wsa_775_aoc9.pdf
20M
Report.HW.633006.2007-11-01.Additional_AOC9_PreDesign_Investigation.pdf
115M
Report.HW.633006.2007-11-01.AOC_9_PreDesign_Investigation.pdf
115M
Report.HW.633006.2008-04-01.LTM_Landfills_Sprin_2007.pdf
271M
Report.HW.633006.2008-04-30.pisces_investigations_SMC_and_TMC_2008.pdf
5.9M
Report.HW.633006.2008-05-01.Fall_2007_Monitoring_Report_On_Base_Groundwater.pdf
4.1M
Report.HW.633006.2008-07-01.LUC_IC_Inspection_2006.pdf
7.6M
Report.HW.633006.2008-08-29.OPS_Landfill6.pdf
723K
Report.HW.633006.2008-09-01.RA_Landfills.pdf
1.1M
Report.HW.633006.2008-10-01.Fall_2007_Annual_LTm_IMC.pdf
52M
Report.HW.633006.2008-10-31.Fall_2007_LTM-report_three_mile_creek.pdf
52M
Report.HW.633006.2008-12-01.On_Base_Groundwater.pdf
15M
Report.HW.633006.2008-12-31.LTM_Petroleum_AOCs.pdf
11M
Report.HW.633006.2009-04-01.LTM_petroleum_SRA.pdf
1.6M
Report.HW.633006.2009-04-01.On_Base_Groundwater_Monitoring_2008.pdf
11M
Report.HW.633006.2009-04-01.petroleum_LTM_appendices.pdf
6.6M
Report.HW.633006.2009-05-01.Monitoring 2008 Landfill AOC's.pdf
634M
Report.HW.633006.2009-06-01.2007_LUCIC_Inspection_Report.pdf
99M
Report.HW.633006.2009-06-02.bound_mod-delist_of_23_parcels.pdf
688K
Report.HW.633006.2009-08-31.Fall_2008_LTM_report_Three_Mile_Creek.pdf
54M
Report.HW.633006.2009-08-31.OBGW_AOCs_monitoring_report_annual.pdf
10M
Report.HW.633006.2009-09-01.implementation_of_landfill1_remedial_action.pdf
5.3M
Report.HW.633006.2009-09-30.inplementation_of_remedial_action_landfill_1_OPS.pdf
1.3M
Report.HW.633006.2009-10-30.addendum_to_final_FS_AOC9.pdf
819K
Report.HW.633006.2009-12-18.fall_2008_annual_LTM_Three_Mile_Creek.pdf
2.2M
Report.HW.633006.2009-12-31.LTM_petroleum_source_areas.pdf
1.6M
Report.HW.633006.2010-01-29.LUC_IC_site_inspection_report.pdf
553K
Report.HW.633006.2010-01-29.LUC_IC_site_inspection_report_appendices.pdf
36M
Report.HW.633006.2010-01-29.well_decommissioning_round4and5.pdf
28M
Report.HW.633006.2010-02-01.FINAL_FS_SVI_Alt_OCRD.pdf
2.3M
Report.HW.633006.2010-02-26.SVI_Buildings_774_776_785_786.pdf
2.3M
Report.HW.633006.2010-03-31.building_133_SVI_evaluation.pdf
961K
Report.HW.633006.2010-03-31.Fall_2009_LTM_report_six_mile_creek.pdf
14M
Report.HW.633006.2010-06-01.2010 5-Year Review Addendum.pdf
21M
Report.HW.633006.2010-09-13.EPA_5_Year_Review.pdf
6.6M
Report.HW.633006.2011-05-01.3-Final Baseline Monitoring Data Summary Report_OCRD.pdf
18M
Report.HW.633006.2011-07-29.fall_2010_three_mile_creek_LTM.pdf
45M
Report.HW.633006.2011-08-31.IRM_completion_report_OBGW.pdf
5.4M
Report.HW.633006.2011-11-30.Nosedocks_1_and_2_Spill_closure.pdf
1.8M
Report.HW.633006.2011-12-30.Spring_2010_Annual_Performance_Monitoring.pdf
1.8M
Report.HW.633006.2012-01-31.LUC_IC_Site_Inspection.pdf
22M
Report.HW.633006.2012-03-01.Final 2011 Annual Monitoring Report for SS060 Building 35 AOC_OCRD.pdf
6.9M
Report.HW.633006.2012-03-01.Final Site Closure Report SS023 Building 20 AOC_OCRD.pdf
78M
Report.HW.633006.2012-03-30.monitoring_report_2011_building_35_AOC_SS060.pdf
14M
Report.HW.633006.2012-03-30.site_closure_building_20_SS023.pdf
4.9M
Report.HW.633006.2012-07-01.Final 2011 Annual LTM Report, Landfill AOCs.pdf
139M
Report.HW.633006.2012-07-01.Final 2011 Annual LTM Rpt_OCRD.pdf
48M
Report.HW.633006.2012-07-01.Final 2011 LUCIC Site Inspection Report_OCRD.pdf
25M
Report.HW.633006.2012-07-31.annual_monitoring_2011_TMC_and_SMC.pdf
45M
Report.HW.633006.2012-07-31.LUC_IC_inspection_2011.pdf
35M
Report.HW.633006.2012-07-31.Three Mile Creek LTM FINAL report part 1 2012.pdf
4.2M
Report.HW.633006.2012-10-31.quarterly_O_and_M_Buildings_774_776_785_786.pdf
17M
Report.HW.633006.2013-01-01.Draft 2012 Annual Landfill AOCs Report.pdf
183M
Report.HW.633006.2013-01-01.Final DP011 Building 3 AOC Closure Report.pdf
27M
Report.HW.633006.2013-01-10.Final 6 mi creek and three mi creek Remedial Action Completion Report-SD031 SD032_OCRD.pdf
20M
Report.HW.633006.2013-01-15.December.Final Site Debris Removal & Soil Sampling Report Area of Interest 474.pdf
8.6M
Report.HW.633006.2013-01-15.Final Quarterly O&M Report - 4th Quarter 2011.pdf
2.1M
Report.HW.633006.2013-01-15.Final Site Debris and Soil Sampling Report AOI 474.pdf
66M
Report.HW.633006.2013-01-31.three_and_six_mile_creek_RA_completion.pdf
32M
Report.HW.633006.2013-02-18.Final Completion Report.Sub-Slap Vapor Mitigation.pdf
83M
Report.HW.633006.2013-03-01.Annual Monitoring Report for SS060 Building 35 AOC.pdf
14M
Report.HW.633006.2013-03-01.SVI Quarterly OM Report (1Q2012).pdf
18M
Report.HW.633006.2013-03-01.SVI Quarterly OM Report (2Q2012).pdf
2.2M
Report.HW.633006.2013-03-06.Final 2012 Annual Landfill AOCs Report-3-4-13.pdf
185M
Report.HW.633006.2013-03-06.Final 2012 LUCIC Site Inspection Report.pdf
42M
Report.HW.633006.2013-04-01.R_PM DSR.pdf
10M
Report.HW.633006.2013-05-01.2012 Annual Monitoring Report SS060 Building 35 AOC.pdf
13M
Report.HW.633006.2013-05-01.Apron 2 OPS_OCRD.pdf
7.5M
Report.HW.633006.2013-05-13.3rd Quarter.SSVM Systems Quarterly O&M Report (3Q2012).pdf
17M
Report.HW.633006.2013-05-22.2012 Annual Monitoring Report SS060 Building 35 AOC_OCRD.pdf
7.4M
Report.HW.633006.2013-05-22.SSVM Systems Quarterly O&M Report 3rd Quarter 2012_OCRD.pdf
17M
Report.HW.633006.2013-05-30.Revised Final Site Closure Report - SD050 Building 214 AOC - Appendix E - Raw Lab Data.pdf
87M
Report.HW.633006.2013-05-31.Revised Final Site Closure Report - DP015 Building 219 AOC - Addendix F - Raw Lab Data.pdf
81M
Report.HW.633006.2013-06-01.FPTA SVI Rpt_OCRD.pdf
47M
Report.HW.633006.2013-06-28.final_status_report_building_104.pdf
1.0M
Report.HW.633006.2013-07-09.Final SVI Quarterly OM Rpt 4th Quarter 2012_OCRD.pdf
6.7M
Report.HW.633006.2013-08-13.Addendum to the Final Site Closure Report for LUC-IC Site AOI 72 - Appendices.pdf
134M
Report.HW.633006.2013-08-28.April 2012 and September 2012 Data Summary Report.pdf
26M
Report.HW.633006.2013-09-01.Final 1Q2013 SVI Quarterly OM Report.pdf
27M
Report.HW.633006.2013-09-04.Final Building 101 SVI Evaluation Report.pdf
21M
Report.HW.633006.2013-09-04.Final SVI Evaluation and Closure Report for FT030 FPTA AOC.pdf
39M
Report.HW.633006.2013-10-01.Final Site Closure Report - Building 211.pdf
3.1M
Report.HW.633006.2013-10-01.Final Site Closure Report - DP015 Building 219 AOC.pdf
25M
Report.HW.633006.2013-10-01.Final Site Closure Report- SD050 Building 214 AOC.pdf
41M
Report.HW.633006.2013-10-13.Final Site Closure Report - Building 211.pdf
3.1M
Report.HW.633006.2013-10-25.Final SVI Quarterly OM Report (2Q-2013).pdf
1.0M
Report.HW.633006.2013-11-07.AFRL RIOCV 150 Electronic Pkwy Ltr.pdf
6.2M
Report.HW.633006.2013-11-07.spill_closure_memo_report.pdf
651K
Report.HW.633006.2013-12-01.DP012 Building 301 AOC Site Investigation Report.pdf
35M
Report.HW.633006.2013-12-11.AOI 72 Site Investigation Report with Removal Action Plan.pdf
11M
Report.HW.633006.2013-12-11.DP012 Building 301 AOC Site Investigation Report.pdf
35M
Report.HW.633006.2014-01-01.Final Spring 2012 Annual Report Performance Monitoring - Appendices.pdf
85M
Report.HW.633006.2014-01-01.Final Spring 2012 Annual Report Performance Monitoring.pdf
15M
Report.HW.633006.2014-01-01.Final Spring 2012_Annual_PM_Report_Jan14_OCRD.pdf
7.5M
Report.HW.633006.2014-01-20.Final Site Closure Report SS060 Building 35 AOC.pdf
25M
Report.HW.633006.2014-03-24.Final April 2013 Data Summary Report - AOC 9.pdf
13M
Report.HW.633006.2014-04-28.Final 2013 Well Decommissioning Report.pdf
2.0M
Report.HW.633006.2014-04-28.Final Site Closure Report - DP013 Building 255 AOC.pdf
78M
Report.HW.633006.2014-04-28.Final SVI Quarterly O&M Report - 3Q-2013.pdf
37M
Report.HW.633006.2014-05-06.Final 2014 Landfill AOC LTM Report Appendices.pdf
319M
Report.HW.633006.2014-06-11.Final LTM Report Landfill AOCs - Appendices.pdf
488M
Report.HW.633006.2014-06-11.Final LTM Report Landfill AOCs.pdf
9.2M
Report.HW.633006.2014-07-17.AOI 474 Site Closure Report-Revised 9-19-2014.pdf
81M
Report.HW.633006.2014-07-24.AOI 474 site closure report.pdf
81M
Report.HW.633006.2014-07-28.Final Spring 2013 Performance Monitoring for On-Site GW AOC_OCRD.pdf
113M
Report.HW.633006.2014-07-28.OBGW_Spring 2013_Report_July14_OCRD.pdf
97M
Report.HW.633006.2014-09-11.Draft AOI 72 Site Closure Report.pdf
68M
Report.HW.633006.2014-10-10.final site closure building 255.pdf
81M
Report.HW.633006.2014-11-04.final FDA site closure report.pdf
1.8M
Report.HW.633006.2014-11-04.final site closure building 219 AOC .pdf
7.0M
Report.HW.633006.2014-11-05.2014_11_5_Final_Griffiss_ISWPA.pdf
2.8M
Report.HW.633006.2014-11-05.Final AOI 72 Site Closure Report.pdf
67M
Report.HW.633006.2014-11-05.final site closure report AOI 72.pdf
67M
Report.HW.633006.2014-11-06.final site closure report building 214 AOC.pdf
3.0M
Report.HW.633006.2014-11-06.Revised Final Site Closure Report - DP015 Building 219 AOC.pdf
7.0M
Report.HW.633006.2014-11-06.Revised Final Site Closure Report-DP015 Building 219 AOC_OCRD.pdf
96M
Report.HW.633006.2014-11-06.Revised Final Site Closure Report Addendum- SD050 Building 214 AOC.pdf
3.0M
Report.HW.633006.2014-11-14.Final Perfluorinated Compounds Release Determination Report.pdf
6.2M
Report.HW.633006.2014-12-04.results for the sample set PFCs.pdf
2.9M
Report.HW.633006.2014-12-12.Final DP012 Building 301 AOC Site Closure Report.pdf
6.8M
Report.HW.633006.2014-12-12.final site closure report AOC building 301.pdf
6.8M
Report.HW.633006.2015-01-05.Final 2Q-2014 ST006 Building 101 AOC SVE System O&M Report.pdf
11M
Report.HW.633006.2015-01-16.REVISED FINAL AOI 474 Site Closure Report.pdf
99M
Report.HW.633006.2015-01-16.REVISED FINAL AOI 474 Site Closure Report_ocrd.pdf
115M
Report.HW.633006.2015-01-21.Revised Final SVI Evaluation and Closure Report for FT-030 FPTA AOC.pdf
39M
Report.HW.633006.2015-01-30.final april 2104 long term monitoring report AOC9.pdf
11M
Report.HW.633006.2015-01-30.final interim remedial action completion report AOC9.pdf
181M
Report.HW.633006.2015-02-27.Technical Report for AMEC PFCs Griffis AFB; Rome, NY.pdf
577K
Report.HW.633006.2015-03-09.Final 3Q-2014 B101 SVE System O&M Report.pdf
20M
Report.HW.633006.2015-03-09.final quaterly O&M sub slab mitigation systems.pdf
30M
Report.HW.633006.2015-03-10.Final 2014 LUCIC Site Inspection Report, Former Griffiss AFB..pdf
87M
Report.HW.633006.2015-04-27.Ecology and Environment Inc.AOC9 S12201.pdf
3.4M
Report.HW.633006.2015-04-27.Final AOC9 Apr 2015 LTM..pdf
13M
Report.HW.633006.2015-04-30.Final 2015 Landfill AOCs Annual LTM Report - Appendices.pdf
329M
Report.HW.633006.2015-05-04.Final SSVM System Quarterly O&M Data Summary Report (4Q2014).pdf
1.5M
Report.HW.633006.2015-05-05.Final 2015 Griffiss PMP Update 05-15.pdf
9.3M
Report.HW.633006.2015-05-05.Final 2015 Landfill AOCs Annual LTM Report - Appendices.pdf
329M
Report.HW.633006.2015-05-09.Final SVI Quarterly O&M Report (3Q-2014).pdf
30M
Report.HW.633006.2015-06-01.GRIFFISS AFB PBR HSP-2015 Update FINAL 063015 CD.pdf
4.3M
Report.HW.633006.2015-07-09.Summary Final 3Q2015 Quarterly SSVM System O&M Report - Appendices.pdf
20M
Report.HW.633006.2015-07-27.Final 4Q-2014 O&M Report, SVE System at ST006.pdf
13M
Report.HW.633006.2015-07-27.Final 4Q-2014 O&M Report, SVE System at ST006_OCRD.pdf
22M
Report.HW.633006.2015-07-31.PFC PA_Griffiss_July 2015 final_Redacted personal privacy.pdf
24M
Report.HW.633006.2015-08-21.Final 2014 Landfill AOC LTM Report.pdf
3.3M
Report.HW.633006.2015-09-01.SIReport_Final_Complete_OCRD.pdf
27M
Report.HW.633006.2015-10-05.Final SSVM Quarterly O&M Report (1Q-2015).pdf
33M
Report.HW.633006.2015-10-29.Addendum to the Final Site Closure Report for LUC-IC Site AOI 72.pdf
1.6M
Report.HW.633006.2015-10-29.Final Quarterly O&M Data Summary Report (2Q-2015).pdf
12M
Report.HW.633006.2015-10-29.Final Quarterly O&M Data Summary Report 2Q-2015_OCRD.pdf
30M
Report.HW.633006.2015-11-05.Final AOI 72 Site Closure Report_OCRD.pdf
56M
Report.HW.633006.2015-11-19.Final - 2Q-2015 ST006 (Building 101 AOC) SVE System O&M Report.pdf
12M
Report.HW.633006.2015-11-20.ST006 SVE System 3Q-4Q 2015 Operation and Maintenance Report - Appendices.pdf
54M
Report.HW.633006.2015-12-01.Final AOC9 Apr 2015 LTM_ocrd.pdf
16M
Report.HW.633006.2015-12-01.SI report_Addendum_B817LF6_FINAL_OCRD.pdf
14M
Report.HW.633006.2015-12-02.SI report_Addendum_B817LF6_FINAL_Dec2015.pdf
13M
Report.HW.633006.2015-12-11.Final 2015 Griffiss LUCIC Site Inspection Report.pdf
59M
Report.HW.633006.2015-12-15.Final 2015-Landfill AOCs Annual LTM Report.pdf
7.8M
Report.HW.633006.2016-01-15.final quarterly SSVM system O&M report.pdf
6.8M
Report.HW.633006.2016-01-20.SIReport_Final_Complete_Sept2015.pdf
21M
Report.HW.633006.2016-02-01.Final SSVM Systems OES and 4Q-2015 Quarterly O&M Report_OCRD.pdf
6.6M
Report.HW.633006.2016-03-08.Final SSVM Systems OES Feb 2016 and 4Q-2015 Quarterly O&M Report.pdf
7.7M
Report.HW.633006.2016-03-15.ST006 SVE System 3Q-4Q 2015 Operation and Maintenance Report.pdf
2.9M
Report.HW.633006.2016-04-06.2015 FIVE YEAR REVIEW griffiss.pdf
8.8M
Report.HW.633006.2016-05-02.final PFCs release determination SI report griffiss.pdf
34M
Report.HW.633006.2016-07-20.Final SSVM Systems Quarterly O&M Report (1Q-2016).pdf
7.6M
Report.HW.633006.2016-07-29.2Q-2016 SSVM Systems Quarterly O&M Report.pdf
16M
Report.HW.633006.2016-07-29.2016 Semiannual LTM Report for Landfills AOCs.pdf
2.5M
Report.HW.633006.2016-09-30.FINAL REVISION 1 SITE INVESTIGATION OF POTENTIAL PERFLUORINATED COMPOUND (PFC).pdf
12M
Report.HW.633006.2016-10-11.Parcel f3a western portion SI summary report use change.pdf
65M
Report.HW.633006.2016-10-31.Final PFC SITE INVESTIGATIONS OF PERFLUORINATED COMPOUNDS (PFC).pdf
23M
Report.HW.633006.2016-10-31.Parcel F3A Site Evaluation Summary Report.pdf
65M
Report.HW.633006.2016-11-30.Final SS062 AOC 9 chlorinated plume OP.pdf
8.8M
Report.HW.633006.2016-12-27.PFC Ltr report Proposed Griffiss Airport Terminal construction and excavation.pdf
1.8M
Report.HW.633006.2017-03-17.GAFB Well Inventory TM_Final.pdf
62M
Report.HW.633006.2017-04-28.DRAFT SITE INSPECTION REPORT FOR AQUEOUS FILM FORMING FOAM (AFFF) AREAS.pdf
61M
Report.HW.633006.2017-05-29.Landfill AOCs TM for Annual LTM.pdf
11M
Report.HW.633006.2017-05-30.OBGW 2016 Annual CERCLA Mont Rpt-Draft01 OBGW.pdf
125M
Report.HW.633006.2017-05-31.draft OBGW 2016 Annual CERCLA Mont Rpt.pdf
124M
Report.HW.633006.2017-07-24.2016 OBGW Annual CERCLA Mont Rpt-Draft01.pdf
125M
Report.HW.633006.2017-07-24.Draft OM Report for SVI Sites-FGAFB.pdf
81M
Report.HW.633006.2017-07-31.Final 2016 LUC-IC SI Rpt (Jan 2017).pdf
44M
Report.HW.633006.2018-05-09.2017 Well Inventory TM_FINAL.pdf
5.8M
Report.HW.633006.2018-06-18.2017 Annual CERCLA Mont Rpt-Final June 2018.pdf
143M
Report.HW.633006.2018-06-18.Final LF AOCs TM 2017 Annual LTM.pdf
21M
Report.HW.633006.2018-07-26.Revised Draft AFFF Griffiss Site Inspection (SI) Report.pdf
73M
Report.HW.633006.2018-11-29.Final AFFF Griffiss SI Report .pdf
487M
Report.HW.633006.2018-11-29.RTC for Revised Draft AFFF .pdf
52K
Report.HW.633006.2019-01-01.Final OMM and Air Sampling Activities Report Jan 2019_ocrd.pdf
38M
Report.HW.633006.2019-05-22.Final 2018 LUC-IC SI Rpt May 2019.pdf
42M
Report.HW.633006.2019-07-02.Final TM SD52-02 ISCO Pilot Study_OCRD.pdf
141M
Report.HW.633006.2019-07-31.Updated PMP 2018-Griffiss complete_OCRD.pdf
3.9M
Report.HW.633006.2019-09-01.SS025 SI Report-Final_OCRD.pdf
164M
Report.HW.633006.2020-01-15.Final SS017 Sup SIR Jan 2020.pdf
7.4M
Report.HW.633006.2020-06-01.Final 2019 Annual LF LTM.pdf
95M
Report.HW.633006.2022-03-28.5 year review griffiss march 2022.pdf
7.3M
Report.HW.633006.2022-08-22.Final 2021 Letter Well Inventory TM.pdf
5.1M
Report.HW.633006.2022-08-22.Final 2021 Well Inventory.pdf
5.1M
Report.HW.633006.2022-08-24.Final 2021 Land Use Controls.pdf
79M
Report.HW.633006.2022-10-21.Final R1 2021 Land Use Controls.pdf
80M
Report.HW.633006.2022-12-01.Final 2021 Annual Landfill LTM Tech Memo.pdf
19M
Report.HW.633006.2022-12-01.Final 2021 OBGW Report.pdf
9.8M
Report.HW.633006.2022-12-12.Griffiss Final 2021 OBGW Report.pdf
9.8M
Report.HW.633006.2022-12-29.Griffiss Final 2021 Annual Landfill LTM TechMemo.pdf
19M
Report.HW.633006.2023-05-11.Final 2022 Well Inventory Report.pdf
5.9M
Report.HW.633006.2023-06-01.Final SD052 2021-2022 OM-SVI Report.pdf
16M
Report.HW.633006.2023-07-31.Final 2022 Annual Landfill Report.pdf
49M
Report.HW.633006.2023-12-11.Final 2022 OBGW Report.pdf
83M
Report.HW.633006.2024-01-01.Final 2022 Land Use Controls Report.pdf
43M
Report.HW.633006.2024-02-01.Final 2022-2023 OM-SVI Report.pdf
19M
Report.HW.633006.2024-05-01.Final 2023 Land Use Controls Report.pdf
74M
Report.HW.633006.2024-09-23.Final 2023 Petroleum Spills Site Report.pdf
32M
Report.HW.633006.2024-10-30.Final 2023 Well Inventory Report.pdf
8.7M
Report.HW.633006.2024-11-15.Final 2023 Annual Landfill Report.pdf
15M
Report.HW.633006.2025-05-19.Final - GAFB SS067 FP Assessment_DGI Report.pdf
213M
Report.HW.633006.2025-05-19.SS067 Free Product Assessment and Data Gap Investigation.pdf
213M
Report.HW.633006.2025-06-20.2024 Well Inventory Report.pdf
16M
Report.HW.633006.2025-07-24.Final Environmental Assessment Airport Business Park Development.pdf
104M
Report.HW.633006.2025-12-19.Final 2024 Petroleum Spills Site Report.pdf
64M
Report.HW.633006.2026-01-25.SS067 FP Assessment DGI Report .pdf
212M
Report.HW.633006.2026-05-29.Final 2025 Petroleum Spills Site Report.pdf
32M
Report.HW.633006.2026-05-29.SS067 2025 PSS Report.pdf
32M
Report.HW.633006.2026-08-11.ATL Well Decommissioning Report.pdf
331K
Report.HW.633006.2026-08-11.GAFB 2025 Well Inventory Report.pdf
14M
Report.HW.633006.2026-08-24.Site SS067 Q2 Revised Data Pkg for SS067.pdf
6.6M
Report.HW.633006.2026-08-28.Draft Final 2025 Annual Landfill Report.pdf
78M
Report.HW.633006.2026-09-04.Final 2025 Annual Landfill Report.pdf
78M
Report.HW.633006.2026-09-25.Final 2025 LUC Report.pdf
190M
Report.HW.633006.2026-09-25.Final SD052 2024-2025 OM-SVI Report.pdf
27M
ROD.HW.633006.2000-01-01.Draft Final ROD Landfill 1.pdf
20M
ROD.HW.633006.2000-06-05.griffis_afb_ou10.pdf
607K
ROD.HW.633006.2000-06-05.griffis_afb_ou11.pdf
1.1M
ROD.HW.633006.2000-06-05.griffis_afb_ou12.pdf
1.1M
ROD.HW.633006.2000-06-05.griffis_afb_ou14.pdf
1.0M
ROD.HW.633006.2000-06-05.griffis_afb_ou19.pdf
546K
ROD.HW.633006.2001-03-05.Draft_Final_ROD_Landfill_6.pdf
1.1M
ROD.HW.633006.2001-03-22.griffis_afb_ou13 Land Fill 6.pdf
408K
ROD.HW.633006.2001-09-27.griffis_afb_ou9.pdf
622K
ROD.HW.633006.2001-09-27.griffis_afb_ou22.pdf
807K
ROD.HW.633006.2001-09-27.griffis_afb_ou23.pdf
351K
ROD.HW.633006.2001-09-27.griffis_afb_ou24.pdf
257K
ROD.HW.633006.2001-09-27.griffis_afb_ou25.pdf
368K
ROD.HW.633006.2002-04-01.griffis_afb_ou15.pdf
947K
ROD.HW.633006.2002-04-01.griffis_afb_ou16.pdf
234K
ROD.HW.633006.2002-04-01.griffis_afb_ou18.pdf
177K
ROD.HW.633006.2002-07-23.ROD_for_3_AOCS.pdf
938K
ROD.HW.633006.2003-07-30.griffis_afb_ou17.pdf
285K
ROD.HW.633006.2003-12-26.six_mile_creek.pdf
3.4M
ROD.HW.633006.2003-12-26.three_mile_creek.pdf
5.5M
ROD.HW.633006.2004-03-01.griffis_afb_ou30.pdf
5.5M
ROD.HW.633006.2004-03-01.griffis_afb_ou31.pdf
3.4M
ROD.HW.633006.2004-11-01.Building3_EPS_Lot69.pdf
2.1M
ROD.HW.633006.2004-11-01.griffis_afb_ou20_ou27_ou28.pdf
2.1M
ROD.HW.633006.2007-08-01.Small_Arms_Range.pdf
882K
ROD.HW.633006.2007-09-01.small_arms_range.pdf
2.0M
ROD.HW.633006.2008-12-01.On_Base_Groundwater.pdf
15M
ROD.HW.633006.2009-04-01.ROD_on_Base_Groundwater.pdf
15M
ROD.HW.633006.2009-09-01.griffis_afb_landfill1_rod_amendment.pdf
11M
ROD.HW.633006.2009-09-01.RODs_Tank_Farms_1_and_3_bldg.43.pdf
25M
ROD.HW.633006.2010-03-30.rod_building_100.pdf
498K
ROD.HW.633006.2010-06-30.FPTA_ROD.pdf
1.1M
ROD.HW.633006.2010-07-01.AOC9_ROD.pdf
1.7M
ROD.HW.633006.2012-09-01.Final ROD - Building 101 AOC.pdf
4.0M
ROD.HW.633006.2012-09-28.Building_101_ROD.pdf
729K
ROD.HW.633006.2016-09-19.Draft SVI Record of Decision-9-19-16.pdf
1.8M
Work Plan.HW.633006.1989-03-29.Construction_Basis_Building_786.pdf
9.5M
Work Plan.HW.633006.1989-12-01.Overall_Management_Plan_IRP.pdf
2.5M
Work Plan.HW.633006.1991-03-01.Off_Base_GW_Well_Installation.pdf
2.5M
Work Plan.HW.633006.1997-08-01.Field_Sampling_Health_and_Safety_and_Quality_Assurance_Project_Plan.pdf
6.4M
Work Plan.HW.633006.1998-12-01.Quality_Assurance_Project_Plan.pdf
2.8M
Work Plan.HW.633006.1999-07-01.Addendum_to_the_ESI_Field_Sampling_Plan_HSAP_QAPP.pdf
3.4M
Work Plan.HW.633006.2002-02-01.Final_Work_Plan.pdf
1.2M
Work Plan.HW.633006.2002-03-01.Contractor_Quality_Control_Plan.pdf
870K
Work Plan.HW.633006.2002-03-01.Contractor_Quality_Control_Plan_LF_7.pdf
960K
Work Plan.HW.633006.2002-03-01.Site_Safety_and_Health_Plan_LF_7.pdf
4.0M
Work Plan.HW.633006.2002-04-01.Hardfill_49A_Environmental_Cleanup_Plan.pdf
44M
Work Plan.HW.633006.2002-05-01.Final_Letter_Work_Plan_Landfills_2_3_5_and_7.pdf
1.4M
Work Plan.HW.633006.2002-05-01.Final_Work_Plan_AOC_Building_101.pdf
4.1M
Work Plan.HW.633006.2002-06-01.Field_Sampling_Health_and_Safety_and_Quality_Assurance_Project_Plan.pdf
5.1M
Work Plan.HW.633006.2002-07-01.Contractor_Quality_Control_Plan.pdf
1.1M
Work Plan.HW.633006.2002-07-01.Sampling_and_Analysis_Plan.pdf
1.6M
Work Plan.HW.633006.2002-07-01.Site_Safety_and_Health_Plan.pdf
2.5M
Work Plan.HW.633006.2002-10-01.Site_Safety_and_Health_Plan.pdf
2.6M
Work Plan.HW.633006.2003-01-01.Lateral_Control_Pit_Excavation_Work_Plan.pdf
126K
Work Plan.HW.633006.2003-12-01.Field_Sampling_Plan.pdf
4.9M
Work Plan.HW.633006.2003-12-01.Site_Safety_and_Health_Plan.pdf
2.8M
Work Plan.HW.633006.2004-01-08.Apron_1_workplan.pdf
535K
Work Plan.HW.633006.2004-03-01.Contractor_Quality_Control_Plan.pdf
570K
Work Plan.HW.633006.2004-03-01.Site_Safety_and_Health_Plan.pdf
2.1M
Work Plan.HW.633006.2004-06-01.Final_Work_Plan.pdf
14M
Work Plan.HW.633006.2005-01-18.Building_100 Dry_Well_Work_Plan.pdf
707K
Work Plan.HW.633006.2005-01-18.Griffis Projects-Final Building 100 Dry well PCB RAWP_OCRD.pdf
2.6M
Work Plan.HW.633006.2006-07-01.Final_Work_Plan.pdf
3.4M
Work Plan.HW.633006.2006-09-29.SVI_Building_101.pdf
1.6M
Work Plan.HW.633006.2006-11-01.Final_Letter_Work_Plan.pdf
1.8M
Work Plan.HW.633006.2008-02-01.RD_Work_Plan.pdf
18M
Work Plan.HW.633006.2008-04-01.Work_Plan_On_Base_Groundwater.pdf
12M
Work Plan.HW.633006.2008-07-01.RAWP_On_Base_Groundwater.pdf
12M
Work Plan.HW.633006.2008-09-01.Performance_Monitoring_WP.pdf
1.4M
Work Plan.HW.633006.2008-10-01.Basewide_Wetlands_management_Plan.pdf
43M
Work Plan.HW.633006.2010-01-29.building_775_extraction_discharge_system_OandM.pdf
604K
Work Plan.HW.633006.2010-06-30.baseline_performance_and_LTM_AOC9.pdf
7.5M
Work Plan.HW.633006.2011-11-03.Debris Pile Removal at Unknown Site 1_OCRD.pdf
1.4M
Work Plan.HW.633006.2011-11-22.Griffiss AFB CERCLA Sites Optimization Plan-Final-FULL REDUCED_OCRD.pdf
2.9M
Work Plan.HW.633006.2011-11-29.health_and_safety_plan_PBR.pdf
601K
Work Plan.HW.633006.2011-11-29.optimization_plan_LTM_program.pdf
2.9M
Work Plan.HW.633006.2012-03-01.Final AOI 474 Site Cleanup and Sampling Work Plan_OCRD.pdf
1.2M
Work Plan.HW.633006.2012-03-01.Final Site Closure Sampling Work Plan-DP011 Building 3 Drywell AOC_OCRD.pdf
16M
Work Plan.HW.633006.2012-03-01.Final Site Closure Sampling Work Plan DP011 Building 3 Drywell AOC_OCRD.pdf
3.4M
Work Plan.HW.633006.2012-03-06.Final AOI 474 Site Cleanup and Sampling Work Plan_OCRD.pdf
1.6M
Work Plan.HW.633006.2012-03-30.AOI_474_debris_removal_and_soil_sampling_plan.pdf
2.2M
Work Plan.HW.633006.2012-03-30.site_closure_sampling_building_3_drywell_DP011.pdf
3.3M
Work Plan.HW.633006.2013-01-01.January.Final.Building 101 AOC Site Closure Plan.pdf
5.1M
Work Plan.HW.633006.2013-01-01.January.Final.FPTA AOC Site Closure Plan.pdf
2.6M
Work Plan.HW.633006.2013-03-22.Final LUCIC Site Closure Plan.pdf
7.2M
Work Plan.HW.633006.2013-06-05.Final Optimization Plan for CERCLA AOC Long Term Monitoring Program.pdf
7.8M
Work Plan.HW.633006.2013-08-01.Griffiss UFP QAPP - Updated- 2013.pdf
37M
Work Plan.HW.633006.2013-08-15.Final Griffiss AFB PBR HASP 2013 update.pdf
3.4M
Work Plan.HW.633006.2013-09-18.RAWP Addendum - AOC 9 Injection.pdf
5.7M
Work Plan.HW.633006.2013-10-11.Final Project Management Plan.pdf
9.6M
Work Plan.HW.633006.2013-10-23.Final Removal Action Plan AOI 474.pdf
680K
Work Plan.HW.633006.2013-10-31.AFRL site_management_plan_building_104.pdf
267K
Work Plan.HW.633006.2014-04-01.Draft HASP 2014 Update .pdf
3.6M
Work Plan.HW.633006.2014-04-11.Draft SVI Proposed Plan.pdf
1.9M
Work Plan.HW.633006.2014-07-11.F_Bld817 RAWP Addendum with letter_OCRD.pdf
3.0M
Work Plan.HW.633006.2014-07-21.Final Rev 1_QPP_PFC Investigation at BRAC Installations.pdf
9.7M
Work Plan.HW.633006.2014-07-24.F_Bld817 RAWP_Adden_w-letter.pdf
2.1M
Work Plan.HW.633006.2014-09-09.Final 2014 Update - Griffiss UFP QAPP.pdf
22M
Work Plan.HW.633006.2015-07-24.Final Griffiss QAPP - Updated-2015.pdf
17M
Work Plan.HW.633006.2016-05-04.site evaluation work plan parcel f3A.pdf
195K
Work Plan.HW.633006.2016-05-13.site evaluation work plan parcel 3A.pdf
195K
Work Plan.HW.633006.2016-07-06.PFC site investigation work plan griffiss.pdf
21M
Work Plan.HW.633006.2016-08-31.Griffiss Final SVI Proposed Plan.pdf
1.6M
Work Plan.HW.633006.2016-09-06.draft optimization plan for landfill aocs LTM.pdf
22M
Work Plan.HW.633006.2016-10-31.Final PFC SITE INVESTIGATIONS OF PERFLUORINATED COMPOUNDS (PFC)-.pdf
15M
Work Plan.HW.633006.2016-11-30.Final Griffiss UFP-QAPP 2016 for LTM.pdf
21M
Work Plan.HW.633006.2016-11-30.Final PMP 2016-Griffiss AFBFINAL 2016 OPENING PHASE PROJECT MANAGEMENT PLAN FORMER GRIFFISS AIR FORCE BASE.pdf
4.2M
Work Plan.HW.633006.2016-11-30.Griffiss LF Optimization Plan-FINAL.pdf
4.8M
Work Plan.HW.633006.2017-02-28.Final Griffiss UFP-QAPP 2016_SC_3sites_final_complete.pdf
16M
Work Plan.HW.633006.2017-03-13.FINAL OBGW SD052 Sites Optimization Work Plan.pdf
14M
Work Plan.HW.633006.2017-03-31.FINAL SD052 Sites Optimization Work Plan .pdf
14M
Work Plan.HW.633006.2017-04-28.Final-SD052-SVI Optimization Plan-April 2017.pdf
4.1M
Work Plan.HW.633006.2019-04-22.AF Research Lab SI Work Plan Feb 2019.pdf
18M
Work Plan.HW.633006.2022-05-13.Final SI WP for Area SS062.pdf
2.9M
Work Plan.HW.633006.2022-05-13.Final SI WP for Area SS067.pdf
3.2M
Work Plan.HW.633006.2022-05-17.Griffiss BECOS UFP-QAPP_Final_signed.pdf
26M
Work Plan.HW.633006.2022-07-01.Final UFP-QAPP ADD for SS062 and SS067.pdf
389K
Work Plan.HW.633006.2022-07-11.Revised Subsurface Soil WP Parcel F4B.pdf
7.7M
Work Plan.HW.633006.2022-09-28.Final OBGW Letter Work Plan.pdf
1.7M
Work Plan.HW.633006.2024-02-13.Final ST006 Site Investigation WP.pdf
2.0M
Work Plan.HW.633006.2025-05-19.Final SS054 System Decommissioning WP.pdf
1.6M