| Name | Size |
| Agreement.BCP.C231127.2019-08-01.Executed BCA.pdf | 5.1M |
| Agreement.BCP.C231127.2023-10-06.Amendment_No1_Tangible_Tax_With_Rider.pdf | 2.9M |
| Application.BCP.C231127.2018-12-12.Complete BCP Application.pdf | 18M |
| Certificate of Completion.BCP.C231127.2023-12-29.Certificate of Completion (COC).pdf | 1.7M |
| Decision Document.BCP.C231127.2021-11-15.Decision Document .pdf | 398K |
| Easement.BCP.C231127.2023-11-08.Recorded EE and Notices.pdf | 2.4M |
| Fact Sheet.BCP.C231127.2019-06-25.Fact sheet - Application Acceptance.pdf | 319K |
| Fact Sheet.BCP.C231127.2019-09-20.Draft_Remedial Investiagtion_Work_Plan_Espanol.pdf | 467K |
| Fact Sheet.BCP.C231127.2019-09-20.Draft_Remedial Investiagtion_Work_Plan_Traditional Chinese.pdf | 521K |
| Fact Sheet.BCP.C231127.2019-09-20.Draft_Remedial Investigation Work Plan.pdf | 467K |
| Fact Sheet.BCP.C231127.2019-10-16.Notice For Extend Comment Period - Draft RIWP.pdf | 75K |
| Fact Sheet.BCP.C231127.2019-11-27.Additional_45-Day_Extension_of_comment_period_on_the_Draft_RI _Work_Plan.pdf | 71K |
| Fact Sheet.BCP.C231127.2020-05-27.Factsheet_Remedial_Investigation_Work_Plan.pdf | 320K |
| Fact Sheet.BCP.C231127.2020-05-27.Final_Remedial_Investigation_Work_Plan.V006.FINAL traditional Chinese.pdf | 460K |
| Fact Sheet.BCP.C231127.2020-05-27.Final_Remedial_Investigation_Work_Plan.V006.FINAL_ES.pdf | 327K |
| Fact Sheet.BCP.C231127.2021-02-04.Factsheet_Draft RIR Submittal.pdf | 671K |
| Fact Sheet.BCP.C231127.2021-02-04.Factsheet_Draft RIR Submittal_Spanish.pdf | 385K |
| Fact Sheet.BCP.C231127.2021-02-04.Factsheet_Draft RIR Submittal_Traditional Chinese.pdf | 654K |
| Fact Sheet.BCP.C231127.2021-06-24.Factsheet - Draft RAWP_Espanol.pdf | 1.3M |
| Fact Sheet.BCP.C231127.2021-06-24.Factsheet - Draft RAWP_ Traditional Chinese.pdf | 1.4M |
| Fact Sheet.BCP.C231127.2021-06-24.Factsheet - Draft Remedial Action Work Plan (RAWP).pdf | 1.3M |
| Fact Sheet.BCP.C231127.2021-11-15.Notice of Cleanup Plan Selected.pdf | 1.2M |
| Fact Sheet.BCP.C231127.2021-11-15.Notice of Cleanup Plan Selected_Spanish.pdf | 1.2M |
| Fact Sheet.BCP.C231127.2021-11-15.Notice of Cleanup Plan Selected_Traditional Chinese.pdf | 1.3M |
| Fact Sheet.BCP.C231127.2022-04-20.Starts Remedial Action - Spanish.pdf | 1.0M |
| Fact Sheet.BCP.C231127.2022-04-20.Starts Remedial Action - Traditional Chinese.pdf | 1.4M |
| Fact Sheet.BCP.C231127.2022-04-20.Starts Remedial Action.pdf | 789K |
| Fact Sheet.BCP.C231127.2024-01-09.Factsheet - Certificate of Completion - Spanish.pdf | 1.9M |
| Fact Sheet.BCP.C231127.2024-01-09.Factsheet - Certificate of Completion - Traditional Chinese.pdf | 2.0M |
| Fact Sheet.BCP.C231127.2024-01-09.Factsheet - Certificate of Completion.pdf | 794K |
| Report.BCP.C231127.2015-09-11.Phase I ESA for 250 Water Street - Langan.pdf | 107M |
| Report.BCP.C231127.2015-11-01.Phase II ESI for 250 Water Street - Langan.pdf | 39M |
| Report.BCP.C231127.2018-06-07.Phase I ESA for HHC.250 Water Street - Langan.pdf | 85M |
| Report.BCP.C231127.2019-06-25.Responsiveness Sumamry - Comments on Application.pdf | 425K |
| Report.BCP.C231127.2020-06-15.Daily Field Report - RI.pdf | 521K |
| Report.BCP.C231127.2020-06-16.Baseline_Air_Monitoring_Results.pdf | 2.2M |
| Report.BCP.C231127.2020-06-16.Daily Field Report - RI.pdf | 6.9M |
| Report.BCP.C231127.2020-06-25.Geophysical Survey.pdf | 1.0M |
| Report.BCP.C231127.2020-07-08.Daily_Field Report __RI_Phase II_Soil Vapor.pdf | 379K |
| Report.BCP.C231127.2020-07-09.Daily Field Report__RI_Phase II_Soil Vapor Continuing.pdf | 1.0M |
| Report.BCP.C231127.2020-07-14.Monthly Progress Report of June 2020.pdf | 104K |
| Report.BCP.C231127.2020-07-27.CAMP Results_Phase III_AOC-3_RI Field Work.pdf | 2.3M |
| Report.BCP.C231127.2020-07-27.Daily Report_Phase III_AOC-3_Mercury_Delineation_ RI Field Work.pdf | 648K |
| Report.BCP.C231127.2020-07-28.CAMP Results_Phase III_AOC-3_ RI Field Work.pdf | 2.2M |
| Report.BCP.C231127.2020-07-28.Daily Report_Phase III_AOC-3_Mercury_Delineation_ RI Field Work.pdf | 853K |
| Report.BCP.C231127.2020-07-29.CAMP Results_Phase III_AOC-3_RI_Field Work.pdf | 2.3M |
| Report.BCP.C231127.2020-07-29.Daily Report_Phase III_AOC-3_Mercury_Delineation_RI_Field Work.pdf | 834K |
| Report.BCP.C231127.2020-07-30.CAMP Results_Phase III_AOC-3_RI Field Work.pdf | 2.3M |
| Report.BCP.C231127.2020-07-30.Daily Report_Phase III_AOC-3_RI_Field Work.pdf | 828K |
| Report.BCP.C231127.2020-07-31.CAMP Results_Phase_III_AOC-3_RI Field work.pdf | 946K |
| Report.BCP.C231127.2020-07-31.Daily Report_Phase III_AOC-3_ RI Field Work.pdf | 925K |
| Report.BCP.C231127.2020-08-03.CAMP Results_Phase III_AOC-3_Side-Walk_RI Field Work.pdf | 2.2M |
| Report.BCP.C231127.2020-08-03.Daily Report_Phase III_AOC-3_Side-Walk_RI Field Work.pdf | 281K |
| Report.BCP.C231127.2020-08-10.Monthly Progress Report of July 2020.pdf | 62K |
| Report.BCP.C231127.2020-08-17.CAMP Results_Phase IV_RI Field Work.pdf | 2.1M |
| Report.BCP.C231127.2020-08-17.Daily Report_Phase IV_RI Field Work.pdf | 297K |
| Report.BCP.C231127.2020-08-18.CAMP Results_Phase IV_ RI Field Work.pdf | 432K |
| Report.BCP.C231127.2020-08-18.Daily Report_Phase IV_RI Field Work.pdf | 295K |
| Report.BCP.C231127.2020-08-18.Lawra Dodge.Excel Environmental Resources_Phase_3_Update_to_Manhattan_Community_Board_1.pdf | 54K |
| Report.BCP.C231127.2020-08-19.CAMP Results_Phase IV_RI Field Work.pdf | 435K |
| Report.BCP.C231127.2020-08-19.Daily Report_Phase IV_RI Field Work.pdf | 281K |
| Report.BCP.C231127.2020-08-20.CAMP Results_Phase IV_RI Field Work.pdf | 2.2M |
| Report.BCP.C231127.2020-08-20.Daily Report_Phase IV_RI Field Work.pdf | 446K |
| Report.BCP.C231127.2020-08-21.CAMP Results_Phase IV_RI Field Work.pdf | 461K |
| Report.BCP.C231127.2020-08-21.Daily Report_Phase IV_RI Field Work.pdf | 294K |
| Report.BCP.C231127.2020-08-24.CAMP Results_Phase IV_RI Field Work.pdf | 443K |
| Report.BCP.C231127.2020-08-24.Daily Resport _Phase IV_RI Field Work.pdf | 289K |
| Report.BCP.C231127.2020-08-25.CAMP Results_Phase IV_RI Filed Work.pdf | 426K |
| Report.BCP.C231127.2020-08-25.Daily Report_Phase IV_RI Field Work.pdf | 287K |
| Report.BCP.C231127.2020-08-26.CAMP Results_Phase IV_RI Field Work.pdf | 435K |
| Report.BCP.C231127.2020-08-26.Daily Report_Phase IV_Ri Field Work.pdf | 296K |
| Report.BCP.C231127.2020-08-27.Lawra Dodge.Excel Environmental Resources_Phase_4_Update_to_Manhattan_Community_Board_1.pdf | 44K |
| Report.BCP.C231127.2020-09-01.Daily Report_Phase V_RI Field Work_Groundwater Sampling.pdf | 282K |
| Report.BCP.C231127.2020-09-02.Daily Report_Phase V_RI Field Work.pdf | 270K |
| Report.BCP.C231127.2020-09-03.Daily Report_Phase V_RI Field Work.pdf | 228K |
| Report.BCP.C231127.2020-09-10.Monthly Report August 2020.pdf | 60K |
| Report.BCP.C231127.2020-09-26.Daily Report _Geotechnical Investigation_CPT Test.pdf | 200K |
| Report.BCP.C231127.2020-10-10.CAMP Results - Geotechnical Investigation .pdf | 428K |
| Report.BCP.C231127.2020-10-10.Daily Report _Geotechnical Investigation Field Work.pdf | 314K |
| Report.BCP.C231127.2020-10-11.CAMP Results - Geotechnical Investigation.pdf | 486K |
| Report.BCP.C231127.2020-10-11.Daily Report - Geotechnical Investigation Filed Work.pdf | 188K |
| Report.BCP.C231127.2020-10-12.CAMP Results_Geotechnical Investigation.pdf | 425K |
| Report.BCP.C231127.2020-10-12.Daily Report _Geotechnical Investigation Field Report.pdf | 191K |
| Report.BCP.C231127.2021-02-04.Report - Draft Remedial Investigation Report (RIR).pdf | 148M |
| Report.BCP.C231127.2021-06-14.CAMP_Parking Lot Repair_June 14, 2021.pdf | 2.2M |
| Report.BCP.C231127.2021-06-14.Daily Report_Parking Lot Repair_June 14, 2021.pdf | 466K |
| Report.BCP.C231127.2021-06-15.CAMP_Parking Lot Repair_June 15, 2021.pdf | 2.2M |
| Report.BCP.C231127.2021-06-15.Daily Report_Parking Lot Repair _June 15, 2021.pdf | 499K |
| Report.BCP.C231127.2021-06-16.CAMP_Parking Lot Repair-June 16, 2021.pdf | 2.2M |
| Report.BCP.C231127.2021-06-16.Daily Report_Parking Lot Repair _June 16, 2021.pdf | 485K |
| Report.BCP.C231127.2021-06-23.Remedial Investigation Report (RIR) - Final.pdf | 148M |
| Report.BCP.C231127.2021-11-15.Responsiveness Summary_250 Water Street_Draft Remedial Action Work Plan.pdf | 250K |
| Report.BCP.C231127.2021-12-04.CAMP_ Geotech Investiagtion_December 4, 2021.pdf | 2.2M |
| Report.BCP.C231127.2021-12-04.Daily Report _ Geotech Investigation _ December 4, 2021.pdf | 717K |
| Report.BCP.C231127.2021-12-05.CAMP_Geotech Investigation _December 5, 2021.pdf | 2.2M |
| Report.BCP.C231127.2021-12-05.Daily Report_ Geotech Investigation_December 5, 2021.pdf | 742K |
| Report.BCP.C231127.2021-12-11.CAMP _Geotech Investigation_December 11, 2021.pdf | 2.2M |
| Report.BCP.C231127.2021-12-11.Daily Report_Geotech Investigation_December 11, 2021.pdf | 702K |
| Report.BCP.C231127.2021-12-12.CAMP_Geotech Investigation _December 12, 2021.pdf | 2.2M |
| Report.BCP.C231127.2021-12-12.Daily Report_Geotech Investigation_December 12, 2021.pdf | 691K |
| Report.BCP.C231127.2021-12-18.CAMP_Geotech Investigation_12-18-2021.pdf | 2.3M |
| Report.BCP.C231127.2021-12-18.Daily Report_Geotech Investigation_12-18-2021.pdf | 732K |
| Report.BCP.C231127.2021-12-19.CAMP_Geotech Investigation_12-19-2021.pdf | 2.3M |
| Report.BCP.C231127.2021-12-19.Daily Report_Geotech Investigation_12-19-2021.pdf | 580K |
| Report.BCP.C231127.2022-01-10.CAMP Raw Data - Geotech Investigation- December 2021.pdf | 5.6M |
| Report.BCP.C231127.2022-01-13.DEC Brownfield Programs 250 Water Street (c231127) Status .pdf | 455K |
| Report.BCP.C231127.2022-02-09.CAMP RAW Data - Remedial Investigation (June - September 2020) .pdf | 15M |
| Report.BCP.C231127.2022-02-12.Testpit Investigation _CAMP_February 12, 2022.pdf | 1.0M |
| Report.BCP.C231127.2022-02-12.Testpit Investigation _Daily Report_February 12, 2022 .pdf | 1.3M |
| Report.BCP.C231127.2022-02-13.Testpit Investigation _CAMP_February 13, 2022.pdf | 812K |
| Report.BCP.C231127.2022-02-13.Testpit Investigation _ February 13, 2022.pdf | 1.0M |
| Report.BCP.C231127.2022-02-21.CAMP_February 21, 2022 .pdf | 907K |
| Report.BCP.C231127.2022-02-21.Daily Field Report_February 21, 2022 .pdf | 1.2M |
| Report.BCP.C231127.2022-02-22.CAMP _February 22, 2022 .pdf | 1.7M |
| Report.BCP.C231127.2022-02-22.Daily Field Report_February 22, 2022 .pdf | 1.7M |
| Report.BCP.C231127.2022-02-23.CAMP_February 23, 2021.pdf | 924K |
| Report.BCP.C231127.2022-02-23.Daily Field Report - February 23, 2021.pdf | 810K |
| Report.BCP.C231127.2022-02-24.CAMP_February 24, 2022.pdf | 903K |
| Report.BCP.C231127.2022-02-24.Daily Field Report_February 24, 2021.pdf | 831K |
| Report.BCP.C231127.2022-03-24.250 Water Street CAMP Raw Data (June-Sept 2020) Formatted.pdf | 14M |
| Report.BCP.C231127.2022-04-05.250 Water Street Schedule Update and Early Foundation Work.pdf | 837K |
| Report.BCP.C231127.2022-04-21.CAMP_April 21, 2022.pdf | 2.0M |
| Report.BCP.C231127.2022-04-21.Daily Report _April 21, 2022.pdf | 733K |
| Report.BCP.C231127.2022-04-22.CAMP _April 22, 2022.pdf | 2.3M |
| Report.BCP.C231127.2022-04-22.Daily Report_April 22, 2022.pdf | 720K |
| Report.BCP.C231127.2022-04-23.CAMP_April 23, 2022.pdf | 2.2M |
| Report.BCP.C231127.2022-04-23.Daily Report_April 23, 2022.pdf | 850K |
| Report.BCP.C231127.2022-04-25.CAMP _ April 25, 2022.pdf | 2.2M |
| Report.BCP.C231127.2022-04-25.Daiy Report _April 25, 2022.pdf | 705K |
| Report.BCP.C231127.2022-05-09.Construction Health and Safety Plan (CHASP) .pdf | 3.9M |
| Report.BCP.C231127.2022-05-09.Remedial Design Report (RDR) - Test Pit Investigation.pdf | 11M |
| Report.BCP.C231127.2022-05-11.Daily Report_ May 11, 2022.pdf | 816K |
| Report.BCP.C231127.2022-05-12.CAMP _ May 12, 2022.pdf | 1.0M |
| Report.BCP.C231127.2022-05-12.Daily Report _ May 12, 2022.pdf | 851K |
| Report.BCP.C231127.2022-05-13.CAMP - May 13, 2022.pdf | 874K |
| Report.BCP.C231127.2022-05-13.Daily Report - May 13, 2022.pdf | 801K |
| Report.BCP.C231127.2022-05-14.CAMP - May 14, 2022.pdf | 870K |
| Report.BCP.C231127.2022-05-14.Daily Report - May 14, 2022.pdf | 864K |
| Report.BCP.C231127.2022-05-16.CAMP Results - May 16, 2022.pdf | 1.0M |
| Report.BCP.C231127.2022-05-17.CAMP Results - May 17, 2022.pdf | 1.1M |
| Report.BCP.C231127.2022-05-17.Daily Report - May 17, 2022.pdf | 1.0M |
| Report.BCP.C231127.2022-05-18.CAMP - May 18, 2022.pdf | 1.0M |
| Report.BCP.C231127.2022-05-18.Daily Report - May 18, 2022.pdf | 1.0M |
| Report.BCP.C231127.2022-05-20.CAMP - May 20, 2022.pdf | 961K |
| Report.BCP.C231127.2022-05-20.Daily Report - May 20, 2022.pdf | 695K |
| Report.BCP.C231127.2022-05-21.CAMP - May 21, 2022.pdf | 894K |
| Report.BCP.C231127.2022-05-21.Daily Report - May 21, 2022.pdf | 717K |
| Report.BCP.C231127.2022-05-23.CAMP - May 23, 2022.pdf | 942K |
| Report.BCP.C231127.2022-05-23.Daily Report - May 23, 2022.pdf | 639K |
| Report.BCP.C231127.2022-05-25.CAMP - May 25, 2022.pdf | 1.1M |
| Report.BCP.C231127.2022-05-25.Daily Report - May 25, 2022.pdf | 721K |
| Report.BCP.C231127.2022-05-26.CAMP _ May 26, 2022.pdf | 1.1M |
| Report.BCP.C231127.2022-05-26.Daily Report _ May 26, 2022.pdf | 904K |
| Report.BCP.C231127.2022-05-27.Daily Report - May 27, 2022.pdf | 787K |
| Report.BCP.C231127.2022-05-31.Daily Report _ May 31, 2022.pdf | 645K |
| Report.BCP.C231127.2022-06-10.Langan Presentation - Completion of 421 A Work & Upcoming Activities.pdf | 2.0M |
| Report.BCP.C231127.2022-06-11.CAMP Result - June 11, 2022.pdf | 1.1M |
| Report.BCP.C231127.2022-06-11.Daily Report - June 11, 2022.pdf | 1.0M |
| Report.BCP.C231127.2022-06-27.Revised - Construction Health And Safety Plan (CHASP) - June 2022.pdf | 3.9M |
| Report.BCP.C231127.2022-06-27.Revised CHASP - Approval Letter _June 2022.pdf | 180K |
| Report.BCP.C231127.2022-06-28.Daily Report - June 28, 2022.pdf | 591K |
| Report.BCP.C231127.2022-06-29.CAMP Results - June 29, 2022.pdf | 876K |
| Report.BCP.C231127.2022-06-29.Daily Report - June 29, 2022.pdf | 598K |
| Report.BCP.C231127.2022-06-30.CAMP Results - June 30, 2022.pdf | 1.1M |
| Report.BCP.C231127.2022-06-30.Daily Report - June 30, 2022.pdf | 575K |
| Report.BCP.C231127.2022-07-15.CAMP - July 15, 2022.pdf | 1.1M |
| Report.BCP.C231127.2022-07-15.July Report - July 15, 2022.pdf | 777K |
| Report.BCP.C231127.2022-07-16.CAMP - July 16, 2022.pdf | 1.1M |
| Report.BCP.C231127.2022-07-16.Daily Report - July 16, 2022.pdf | 836K |
| Report.BCP.C231127.2022-07-20.CAMP - July 20, 2022.pdf | 960K |
| Report.BCP.C231127.2022-07-20.Daily Report - July 20, 2022.pdf | 895K |
| Report.BCP.C231127.2022-07-21.CAMP - July 21, 2022.pdf | 965K |
| Report.BCP.C231127.2022-07-21.Daily Report - July 21, 2022.pdf | 1.0M |
| Report.BCP.C231127.2022-07-22.CAMP - July 22, 2022.pdf | 1.0M |
| Report.BCP.C231127.2022-07-22.Daily Report - July 22, 2022.pdf | 712K |
| Report.BCP.C231127.2022-07-22.Daily Report - July 23, 2022.pdf | 863K |
| Report.BCP.C231127.2022-07-23.CAMP - July 23, 2022.pdf | 932K |
| Report.BCP.C231127.2022-07-24.Daily Report - July 24, 2022.pdf | 577K |
| Report.BCP.C231127.2022-07-25.CAMP - July 25, 2022.pdf | 1.2M |
| Report.BCP.C231127.2022-07-26.CAMP - July 26, 2022.pdf | 1.0M |
| Report.BCP.C231127.2022-07-26.Daily Report - July 26, 2022.pdf | 819K |
| Report.BCP.C231127.2022-07-27.CAMP - July 27, 2022.pdf | 1.2M |
| Report.BCP.C231127.2022-07-27.July 27, 2022.pdf | 731K |
| Report.BCP.C231127.2022-08-01.CAMP - August 1, 2022.pdf | 1.2M |
| Report.BCP.C231127.2022-08-01.Daily Report - August 1, 2022.pdf | 735K |
| Report.BCP.C231127.2022-08-02.CAMP - August 2, 2022.pdf | 1.1M |
| Report.BCP.C231127.2022-08-02.Daily Report - August 2, 2022.pdf | 856K |
| Report.BCP.C231127.2022-08-03.Daily Report - August 3, 2022.pdf | 692K |
| Report.BCP.C231127.2022-08-04.CAMP Report _August 4 to August 31, 2022.pdf | 19M |
| Report.BCP.C231127.2022-08-04.Daily Report - August 4 to August 31, 2022.pdf | 9.8M |
| Report.BCP.C231127.2022-09-01.CAMP Report _September 1 to October 5_2022.pdf | 15M |
| Report.BCP.C231127.2022-09-01.Daily Report - September 1 to October 5, 2022.pdf | 12M |
| Report.BCP.C231127.2022-10-07.CAMP Report - October 7, 2022.pdf | 945K |
| Report.BCP.C231127.2022-10-07.Daily Report - October 7, 2022.pdf | 745K |
| Report.BCP.C231127.2022-10-08.Daily Report - October 8, 2022.pdf | 471K |
| Report.BCP.C231127.2022-10-09.Daily Report - October 9, 2022.pdf | 501K |
| Report.BCP.C231127.2022-10-10.Daily Report - October 10, 2022.pdf | 468K |
| Report.BCP.C231127.2022-10-11.CAMP - October 11, 2022.pdf | 1.2M |
| Report.BCP.C231127.2022-10-11.Daily Report - October 11, 2022.pdf | 657K |
| Report.BCP.C231127.2022-10-14.Daily Report - October 14, 2022.pdf | 770K |
| Report.BCP.C231127.2022-10-15.Daily Report - October 15, 2022.pdf | 461K |
| Report.BCP.C231127.2022-10-16.Daily Report - October 16, 2022.pdf | 454K |
| Report.BCP.C231127.2022-10-17.CAMP Report - October 17, 2022.pdf | 938K |
| Report.BCP.C231127.2022-10-17.Daily Report - October 17, 2022.pdf | 595K |
| Report.BCP.C231127.2022-10-18.CAMP Report - October 18, 2022.pdf | 1.2M |
| Report.BCP.C231127.2022-10-19.CAMP Report - October 19, 2022.pdf | 1.2M |
| Report.BCP.C231127.2022-10-19.Daily Report - October 19, 2022.pdf | 730K |
| Report.BCP.C231127.2022-10-20.CAMP Report - October 20, 2022.pdf | 1.1M |
| Report.BCP.C231127.2022-10-20.Daily Report - October 20, 2022.pdf | 704K |
| Report.BCP.C231127.2022-10-21.CAMP Report - October 21, 2022.pdf | 1.2M |
| Report.BCP.C231127.2022-10-21.Daily Report - October 21, 2022.pdf | 690K |
| Report.BCP.C231127.2023-01-10.Monthly Report - December 2022.pdf | 37K |
| Report.BCP.C231127.2023-03-28.Daily Report - March 28, 2023_Revision_1 Geotechnical Boring .pdf | 425K |
| Report.BCP.C231127.2023-03-29.Daily Report - March 29, 2023_Revision_1 Geotechnical Boring .pdf | 432K |
| Report.BCP.C231127.2023-03-30.Daily Report - March 30, 2023_Revision_1 Geotechnical Boring .pdf | 845K |
| Report.BCP.C231127.2023-03-31.Daily Report - March 31, 2023_Revision_1 Geotechnical Boring .pdf | 838K |
| Report.BCP.C231127.2023-04-03.Daily Report - April 3, 2023_Revision_1 Geotechnical Boring .pdf | 434K |
| Report.BCP.C231127.2023-04-04.Daily Report - April 4, 2023_Geotechnical Boring.pdf | 726K |
| Report.BCP.C231127.2023-04-05.Daily Report - April 5, 2023_Geotechnical Boring.pdf | 730K |
| Report.BCP.C231127.2023-06-09.Construction Health and Safety Plan (CHASP) - Revision - 2 _ June 9, 2023.pdf | 3.0M |
| Report.BCP.C231127.2023-06-13.Approval Letter - Construction Health & Safety Plan - Revision 2.pdf | 178K |
| Report.BCP.C231127.2023-06-19.Daily Report - June 19, 2023.pdf | 581K |
| Report.BCP.C231127.2023-06-20.Daily Report - June 20, 2023.pdf | 400K |
| Report.BCP.C231127.2023-06-22.Daily Report - June 22, 2023.pdf | 412K |
| Report.BCP.C231127.2023-06-23.Daily Report - June 23, 2023.pdf | 569K |
| Report.BCP.C231127.2023-06-27.CAMP - June 27, 2023.pdf | 257K |
| Report.BCP.C231127.2023-06-27.Daily Report - June 27, 2023.pdf | 445K |
| Report.BCP.C231127.2023-06-28.CAMP - June 28, 2023.pdf | 348K |
| Report.BCP.C231127.2023-06-28.Daily Report - June 28, 2023.pdf | 465K |
| Report.BCP.C231127.2023-06-29.CAMP - June 29, 2023.pdf | 794K |
| Report.BCP.C231127.2023-06-29.Daily Report - June 29, 2023.pdf | 578K |
| Report.BCP.C231127.2023-06-30.CAMP - June 30, 2023.pdf | 302K |
| Report.BCP.C231127.2023-06-30.Daily Report - June 30, 2023.pdf | 579K |
| Report.BCP.C231127.2023-07-05.CAMP Report - July 5, 2023.pdf | 391K |
| Report.BCP.C231127.2023-07-05.Daily Report - July 5, 2023.pdf | 624K |
| Report.BCP.C231127.2023-07-05.Daily Report - July 5, 2023 Revised .pdf | 413K |
| Report.BCP.C231127.2023-07-06.CAMP Report - July 6, 2023.pdf | 428K |
| Report.BCP.C231127.2023-07-06.Daily Report - July 06, 2023.pdf | 584K |
| Report.BCP.C231127.2023-07-07.Daily Report - July 7, 2023.pdf | 662K |
| Report.BCP.C231127.2023-07-10.CAMP Report - July 10, 2023.pdf | 667K |
| Report.BCP.C231127.2023-07-10.Daily Report - July 10, 2023.pdf | 462K |
| Report.BCP.C231127.2023-07-11.CAMP - July 11, 2023.pdf | 450K |
| Report.BCP.C231127.2023-07-11.Daily Field Report - July 11, 2023.pdf | 687K |
| Report.BCP.C231127.2023-07-12.CAMP - July 12, 2023.pdf | 444K |
| Report.BCP.C231127.2023-07-12.Daily Field Report - July 12, 2023.pdf | 741K |
| Report.BCP.C231127.2023-07-13.CAMP - July 13, 2023.pdf | 450K |
| Report.BCP.C231127.2023-07-13.Daily Field Report - July 13, 2023.pdf | 743K |
| Report.BCP.C231127.2023-07-14.CAMP - July 14, 2023.pdf | 415K |
| Report.BCP.C231127.2023-07-14.Daily Field Report - July 14, 2023.pdf | 636K |
| Report.BCP.C231127.2023-07-17.CAMP - July 17, 2023.pdf | 445K |
| Report.BCP.C231127.2023-07-17.Daily Field Report - July 17, 2023.pdf | 697K |
| Report.BCP.C231127.2023-07-18.CAMP - July 18, 2023.pdf | 435K |
| Report.BCP.C231127.2023-07-18.Daily Report - July 18, 2023.pdf | 629K |
| Report.BCP.C231127.2023-07-19.CAMP - July 19, 2023.pdf | 485K |
| Report.BCP.C231127.2023-07-19.Daily Report - July 19, 2023 .pdf | 510K |
| Report.BCP.C231127.2023-07-20.CAMP - July 20, 2023.pdf | 444K |
| Report.BCP.C231127.2023-07-20.Daily Report - July 20, 2023.pdf | 4.8M |
| Report.BCP.C231127.2023-07-21.CAMP - July 21, 2023.pdf | 332K |
| Report.BCP.C231127.2023-07-21.Daily Report - July 21, 2023.pdf | 648K |
| Report.BCP.C231127.2023-07-24.CAMP - July 24, 2023.pdf | 447K |
| Report.BCP.C231127.2023-07-24.Daily Report - July 24, 2023.pdf | 652K |
| Report.BCP.C231127.2023-07-25.CAMP Report - July 25, 2023.pdf | 474K |
| Report.BCP.C231127.2023-07-25.Daily Report - July 25, 2023.pdf | 622K |
| Report.BCP.C231127.2023-07-26.CAMP Report - Juy 26, 2023.pdf | 479K |
| Report.BCP.C231127.2023-07-26.Daily Report - July 26, 2023.pdf | 643K |
| Report.BCP.C231127.2023-07-27.CAMP - July 27, 2023.pdf | 474K |
| Report.BCP.C231127.2023-07-27.Daily Report - July 27, 2023.pdf | 617K |
| Report.BCP.C231127.2023-07-28.CAMP - July 28, 2023.pdf | 485K |
| Report.BCP.C231127.2023-07-28.Daily Report - July 28, 2023.pdf | 661K |
| Report.BCP.C231127.2023-07-31.CAMP Report - July 31, 2023.pdf | 461K |
| Report.BCP.C231127.2023-07-31.Daily Report - July 31, 2023.pdf | 634K |
| Report.BCP.C231127.2023-07-31.Groundwater Monitoring Plan - Final .pdf | 5.2M |
| Report.BCP.C231127.2023-08-01.CAMP - August 1, 2023.pdf | 455K |
| Report.BCP.C231127.2023-08-01.Daily Report - August 1, 2023.pdf | 652K |
| Report.BCP.C231127.2023-08-02.CAMP Report - August 2, 2023_Updated.pdf | 454K |
| Report.BCP.C231127.2023-08-02.Daily Report - August 2, 2023.pdf | 670K |
| Report.BCP.C231127.2023-08-03.CAMP - August 3, 2023.pdf | 510K |
| Report.BCP.C231127.2023-08-03.Daily Report - August 3, 2023.pdf | 679K |
| Report.BCP.C231127.2023-08-04.CAMP Report - August 4, 2023.pdf | 488K |
| Report.BCP.C231127.2023-08-04.Daily Report - August 4, 2023.pdf | 676K |
| Report.BCP.C231127.2023-08-07.Daily Report - August 7, 2023.pdf | 676K |
| Report.BCP.C231127.2023-08-08.CAMP - August 8, 2023.pdf | 500K |
| Report.BCP.C231127.2023-08-08.Daily Report - August 8, 2023.pdf | 630K |
| Report.BCP.C231127.2023-08-09.CAMP Report - August 9, 2023.pdf | 412K |
| Report.BCP.C231127.2023-08-09.Daily Report - August 9, 2023.pdf | 499K |
| Report.BCP.C231127.2023-08-10.Daily Report - August 10, 2023.pdf | 657K |
| Report.BCP.C231127.2023-08-11.CAMP Report - August 11, 2023.pdf | 460K |
| Report.BCP.C231127.2023-08-11.Daily Report - August 11, 2023.pdf | 647K |
| Report.BCP.C231127.2023-08-14.CAMP Report - August 14 to August 18, 2023.pdf | 2.2M |
| Report.BCP.C231127.2023-08-14.Daily Report - August 14 to August 18, 2023.pdf | 2.1M |
| Report.BCP.C231127.2023-08-21.CAMP Report - August 21, 2023.pdf | 597K |
| Report.BCP.C231127.2023-08-21.Daily Report - August 21, 2023.pdf | 624K |
| Report.BCP.C231127.2023-08-22.CAMP Report - August 22, 2023.pdf | 535K |
| Report.BCP.C231127.2023-08-22.Daily Report - August 22, 2023.pdf | 625K |
| Report.BCP.C231127.2023-08-23.CAMP Report - August 23, 2023.pdf | 533K |
| Report.BCP.C231127.2023-08-23.Daily Report - August 23, 2023.pdf | 645K |
| Report.BCP.C231127.2023-08-24.CAMP Report - August 24, 2023.pdf | 558K |
| Report.BCP.C231127.2023-08-24.Daily Report - August 24, 2023.pdf | 657K |
| Report.BCP.C231127.2023-08-25.CAMP Report - August 25, 2023.pdf | 545K |
| Report.BCP.C231127.2023-08-25.Daily Report - August 25, 2023.pdf | 605K |
| Report.BCP.C231127.2023-08-29.CAMP Report - August 29, 2023.pdf | 521K |
| Report.BCP.C231127.2023-08-29.Daily Report - August 29, 2023.pdf | 648K |
| Report.BCP.C231127.2023-08-30.CAMP Report - August 30, 2023.pdf | 592K |
| Report.BCP.C231127.2023-08-30.Daily Report - August 30, 2023.pdf | 649K |
| Report.BCP.C231127.2023-08-31.CAMP Report - August 31, 2023.pdf | 491K |
| Report.BCP.C231127.2023-08-31.Daily Report - August 31, 2023.pdf | 708K |
| Report.BCP.C231127.2023-09-01.CAMP Report - September 1, 2023.pdf | 521K |
| Report.BCP.C231127.2023-09-01.Daily Report - September 1, 2023.pdf | 521K |
| Report.BCP.C231127.2023-09-05.CAMP Report - September 5, 2023.pdf | 526K |
| Report.BCP.C231127.2023-09-05.Daily Report - September 5, 2023.pdf | 671K |
| Report.BCP.C231127.2023-09-06.CAMP Report - September 6, 2023.pdf | 561K |
| Report.BCP.C231127.2023-09-06.Daily Report - September 6, 2023.pdf | 613K |
| Report.BCP.C231127.2023-09-07.CAMP Report - September 7, 2023.pdf | 496K |
| Report.BCP.C231127.2023-09-07.Daily Report - September 7, 2023.pdf | 657K |
| Report.BCP.C231127.2023-09-08.CAMP Report - September 8, 2023.pdf | 474K |
| Report.BCP.C231127.2023-09-08.Daily Report - September 8, 2023.pdf | 662K |
| Report.BCP.C231127.2023-09-11.CAMP Report - September 11, 2023.pdf | 533K |
| Report.BCP.C231127.2023-09-11.Daily Report - September 11, 2023.pdf | 469K |
| Report.BCP.C231127.2023-09-12.CAMP Report - September 12, 2023.pdf | 533K |
| Report.BCP.C231127.2023-09-12.Daily Report - September 12, 2023.pdf | 593K |
| Report.BCP.C231127.2023-09-15.CAMP Report - September 15, 2023.pdf | 502K |
| Report.BCP.C231127.2023-09-15.Daily Report - September 15, 2023.pdf | 628K |
| Report.BCP.C231127.2023-09-18.CAMP Report - September 18, 2023.pdf | 533K |
| Report.BCP.C231127.2023-09-18.Daily Report - September 18, 2023.pdf | 792K |
| Report.BCP.C231127.2023-09-19.CAMP Report - September 19, 2023.pdf | 508K |
| Report.BCP.C231127.2023-09-19.Daily Report - September 19, 2023.pdf | 644K |
| Report.BCP.C231127.2023-09-20.CAMP Report - September 20, 2023.pdf | 686K |
| Report.BCP.C231127.2023-09-20.Daily Report - September 20, 2023.pdf | 622K |
| Report.BCP.C231127.2023-09-21.CAMP Report - September 21, 2023.pdf | 562K |
| Report.BCP.C231127.2023-09-21.Daily Report - September 21, 2023.pdf | 649K |
| Report.BCP.C231127.2023-09-26.CAMP Report - September 26, 2023.pdf | 548K |
| Report.BCP.C231127.2023-09-26.Daily report - September 26, 2023.pdf | 776K |
| Report.BCP.C231127.2023-09-27.CAMP Report - September 27, 2023.pdf | 568K |
| Report.BCP.C231127.2023-09-27.Daily Report - September 27, 2023.pdf | 676K |
| Report.BCP.C231127.2023-09-28.CAMP Report - September 28, 2023.pdf | 569K |
| Report.BCP.C231127.2023-09-28.Daily Report - September 28, 2023.pdf | 817K |
| Report.BCP.C231127.2023-10-05.CAMP Report - October 5, 2023.pdf | 646K |
| Report.BCP.C231127.2023-10-05.Daily Report - October 5, 2023.pdf | 628K |
| Report.BCP.C231127.2023-10-06.CAMP Report - October 6, 2023.pdf | 575K |
| Report.BCP.C231127.2023-10-06.Daily Report - October 6, 2023.pdf | 614K |
| Report.BCP.C231127.2023-10-11.CAMP Report - October 11, 2023.pdf | 548K |
| Report.BCP.C231127.2023-10-11.Daily Report - October 11, 2023.pdf | 710K |
| Report.BCP.C231127.2023-10-12.CAMP Report - October 12, 2023.pdf | 619K |
| Report.BCP.C231127.2023-10-12.Daily Report - October 12, 2023.pdf | 661K |
| Report.BCP.C231127.2023-10-13.CAMP Report - October 13, 2023.pdf | 566K |
| Report.BCP.C231127.2023-10-13.Daily Report - October 13, 2023.pdf | 687K |
| Report.BCP.C231127.2023-10-16.CAMP Report - October 16, 2023.pdf | 596K |
| Report.BCP.C231127.2023-10-16.Daily Report - October 16, 2023.pdf | 634K |
| Report.BCP.C231127.2023-10-17.CAMP Report - October 17, 2023.pdf | 591K |
| Report.BCP.C231127.2023-10-17.Daily Report - October 17, 2023.pdf | 702K |
| Report.BCP.C231127.2023-10-18.CAMP - October 18, 2023.pdf | 638K |
| Report.BCP.C231127.2023-10-18.Daily Report - October 18, 2023.pdf | 706K |
| Report.BCP.C231127.2023-10-19.CAMP Report - October 19, 2023.pdf | 570K |
| Report.BCP.C231127.2023-10-19.Daily Report - October 19, 2023.pdf | 631K |
| Report.BCP.C231127.2023-10-23.CAMP Report - October 23, 2023.pdf | 565K |
| Report.BCP.C231127.2023-10-23.Daily Report - October 23, 2023.pdf | 647K |
| Report.BCP.C231127.2023-10-26.CAMP Report - October 26, 2023.pdf | 606K |
| Report.BCP.C231127.2023-10-26.Daily Report - October 26, 2023.pdf | 572K |
| Report.BCP.C231127.2023-11-03.CAMP Report - November 3, 2023.pdf | 613K |
| Report.BCP.C231127.2023-11-03.Daily Report - November 3, 2023.pdf | 661K |
| Report.BCP.C231127.2023-11-04.CAMP Report - November 4, 2023.pdf | 443K |
| Report.BCP.C231127.2023-11-04.Daily Report - November 4, 2023.pdf | 633K |
| Report.BCP.C231127.2023-11-06.CAMP Report - November 6, 2023.pdf | 884K |
| Report.BCP.C231127.2023-11-06.Daily Report - November 6, 2023.pdf | 671K |
| Report.BCP.C231127.2023-11-07.CAMP Report -November 7, 2023.pdf | 690K |
| Report.BCP.C231127.2023-11-07.Daily Report - November 7, 2023.pdf | 736K |
| Report.BCP.C231127.2023-11-09.CAMP Report - November 9, 2023.pdf | 668K |
| Report.BCP.C231127.2023-11-09.Daily Report - November 9, 2023.pdf | 790K |
| Report.BCP.C231127.2023-11-10.CAMP Report -November 10, 2023.pdf | 637K |
| Report.BCP.C231127.2023-11-10.Daily Report - Novemebr 10, 2023.pdf | 704K |
| Report.BCP.C231127.2023-11-11.CAMP Report- November 11, 2023.pdf | 385K |
| Report.BCP.C231127.2023-11-11.Daily Report - Novemebr 11, 2023.pdf | 655K |
| Report.BCP.C231127.2023-11-13.CAMP - Novemebr 13, 2023.pdf | 626K |
| Report.BCP.C231127.2023-11-13.Daily Report- Novemebr 13, 2023.pdf | 622K |
| Report.BCP.C231127.2023-11-15.CAMP Report - November 15, 2023.pdf | 655K |
| Report.BCP.C231127.2023-11-15.Daily Report - November 15, 2023.pdf | 725K |
| Report.BCP.C231127.2023-11-16.CAMP Report- November 16, 2023.pdf | 621K |
| Report.BCP.C231127.2023-11-16.Daily Report - November 16, 2023.pdf | 629K |
| Report.BCP.C231127.2023-11-17.CAMP Report - Novemebr 17, 2023.pdf | 614K |
| Report.BCP.C231127.2023-11-17.Daily Report - Novemebr 17, 2023.pdf | 573K |
| Report.BCP.C231127.2023-11-18.CAMP Report - Novemebr 18, 2023.pdf | 404K |
| Report.BCP.C231127.2023-11-18.Daily Report - Novemebr 18, 2023.pdf | 784K |
| Report.BCP.C231127.2023-11-20.CAMP Report -Novemebr 20 , 2023.pdf | 589K |
| Report.BCP.C231127.2023-11-20.Daily Report - Novemebr 20, 2023.pdf | 540K |
| Report.BCP.C231127.2023-11-21.CAMP Report - November 21, 2023.pdf | 781K |
| Report.BCP.C231127.2023-11-21.Daily Report - November 21, 2023.pdf | 695K |
| Report.BCP.C231127.2023-11-22.CAMP Report - November 22, 2023.pdf | 524K |
| Report.BCP.C231127.2023-11-22.Daily Report - November 22, 2023.pdf | 601K |
| Report.BCP.C231127.2023-11-27.CAMP Report - November 27, 2023.pdf | 593K |
| Report.BCP.C231127.2023-11-27.Daily Report - November 27, 2023.pdf | 778K |
| Report.BCP.C231127.2023-11-28.CAMP Report - Novemebr 28, 2023.pdf | 573K |
| Report.BCP.C231127.2023-11-28.Daily Report - November 28, 2023.pdf | 657K |
| Report.BCP.C231127.2023-12-04.CAMP Report - December 4, 2023.pdf | 675K |
| Report.BCP.C231127.2023-12-04.Daily Report - December 4, 2023.pdf | 703K |
| Report.BCP.C231127.2023-12-05.CAMP Report - December 5, 2023.pdf | 614K |
| Report.BCP.C231127.2023-12-05.Daily Report - December 5, 2023.pdf | 666K |
| Report.BCP.C231127.2023-12-06.CAMP Report - December 6, 2023.pdf | 569K |
| Report.BCP.C231127.2023-12-06.Daily Report - December 6, 2023.pdf | 756K |
| Report.BCP.C231127.2023-12-07.CAMP Report - December 7, 2023.pdf | 596K |
| Report.BCP.C231127.2023-12-07.Daily Report - December 7, 2023.pdf | 768K |
| Report.BCP.C231127.2023-12-08.CAMP Report - December 8, 2023.pdf | 541K |
| Report.BCP.C231127.2023-12-08.Daily Report - December 8, 2023.pdf | 646K |
| Report.BCP.C231127.2023-12-28.250 Water Street - Final Engineering Report_(includes Appendix C)_Final.pdf | 3.3G |
| Report.BCP.C231127.2023-12-28.Final Engineering Report (FER) including Appendix C - Previous Environmental Reports.pdf | 1.6G |
| Report.BCP.C231127.2023-12-28.Site Management Plan (SMP) - Final .pdf | 36M |
| Report.BCP.C231127.2024-04-10.Monthly Progress Report - March 2024.pdf | 39K |
| Work Plan.BCP.C231127.2019-09-16.Draft RIWP PowerPoint Presentation for Public Meeting.pdf | 2.2M |
| Work Plan.BCP.C231127.2020-05-13.Remedial Investigation Work Plan - Final.pdf | 18M |
| Work Plan.BCP.C231127.2020-05-19.DEC RIWP Approval Letter.pdf | 98K |
| Work Plan.BCP.C231127.2020-06-08.Revised_Final_RIWP_Presentation_NYSDEC.pdf | 3.1M |
| Work Plan.BCP.C231127.2021-06-23.Workplan - Draft Remedial Action Work Plan (RAWP)_June 24, 2021.pdf | 25M |
| Work Plan.BCP.C231127.2021-09-21.Presentation by Langan - Draft RAWP.pdf | 7.3M |
| Work Plan.BCP.C231127.2021-11-09.Final - Remedial Action Work Plan [Included - Appendix C_ Remedial Investigation Report] .pdf | 178M |
| Work Plan.BCP.C231127.2021-11-09.Final - Remedial Action Work Plan [ No - Appendix C_Remedial Investigation Report].pdf | 30M |
| Work Plan.BCP.C231127.2021-11-15.Approval Letter - Remedial Action Work Plan (RAWP) .pdf | 175K |
| Work Plan.BCP.C231127.2021-11-15.Approval Letter - Remedial Action Work Plan.pdf | 175K |
| Work Plan.BCP.C231127.2022-01-13.Langan Presentation - RDIWP.pdf | 1.4M |
| Work Plan.BCP.C231127.2022-02-09.Community Stakeholder Work Group - Questions and Answers _January 2022 .pdf | 177K |
| Work Plan.BCP.C231127.2022-02-11.Remedial Design Investigation Work Plan (RDIWP) - Final .pdf | 6.6M |
| Work Plan.BCP.C231127.2026-04-27.Subsurface Investigation Work Plan.pdf | 2.5M |